Eastern Region 2012 Chip Seal
Eastern Region 2015 Chip Seal
I-205 - Mill Plain Interchange to NE 18th Street - Build Interchange - Stage 2
I-405 - Concrete Pavement Rehabilitation - Complete September 2013
I-405 - NB SR 167 Ramp to NB I-405 - Major Drainage Repair - Complete September 2013
I-405 - NE 116th St Interchange and Street Improvement Project - Complete March 2013
I-405 - NE 132nd St. Interchange Improvements
I-405 - NE 44th to 112th Ave. SE Widening
I-405 - NE 6th to I-5 Widening and Express Toll Lanes
I-405 - NE 8th St to SR 520 Braided Ramps - Interchange Improvements - Complete May 2012
I-405 - SB SE 8th St to Northup Way Vic - Paving - Completed September 2014
I-405 - SR 167 Interchange Direct Connector Project
I-5 - Birch Bay Lynden Rd Bridge 5/834 - Bridge Repair
I-5 - Chamber Way - Girder Replacement - Completed November 2013
I-5 - Cowlitz River Bridge to Koontz Rd Vicinity - Paving
I-5 - Grand Mound to Maytown Stage Two - Replace Interchange - Complete October 2014
I-5 - Hill Ditch Bridge to Joe Leary Slough - Paving
I-5 - I-205 to North Fork Lewis River Bridge - Rehabilitate Pavement
I-5 - King County Pavement Repair - Complete July 2013
I-5 - M Street Bridge & I-705 Overcrossings Seismic Retrofit -  Complete March 2014
I-5 - Mellen Street to Blakeslee Junction
I-5 - Mounts Road to Thorne Ln I/C - Corridor Improvements
I-5 - NB Nooksack River to Blaine - Paving
I-5 - NB Seneca to SR 520 - Mobility Improvements
I-5 - NE 117th St to SR 104 Pavement Repair - Complete November 2015
I-5 - NE 179th Street to N. Fork Lewis River Bridge - Paving - Complete November 2013
I-5 - Nisqually River Bridges - Bridge Painting - Complete April 2014
I-5 - Nisqually Road SW/JBLM Mounts Road Gate - Signal Completed June 2014
I-5 - Nooksack River Bridges - Painting - Completed August 2015
I-5 - Nulle Road to Iowa St Vicinity - Paving Project
I-5 - Pavement - University District Seattle - Complete July 2013
I-5 - Portland Avenue to Port of Tacoma Road - Northbound HOV Stage 1 - Complete December 2012
I-5 - Reconstruct Interchange at NE 134th  (Salmon Creek Interchange Project) - Completed September 2014
I-5 - S. 272nd St. to S. Rose St. Seismic Retrofit - Complete November 2015
I-5 - Samish Way, Northwest Ave to Birch Bay Lynden Rd. Vicinity - Traveler Information Systems - Completed March 2013
I-5 - SB 320th Street Noise Wall Replacement - Complete December 2013
I-5 - SB CD Lane and 356th St. Intersection Improvements
I-5 - SB S 320th St to Duwamish River Bridge - Concrete Pavement Rehab
I-5 - Seattle Bridge Repair - Complete June 2014
I-5 - Ship Canal Bridge - Noise Study
I-5 - Skagit River Bridge Replacement - Completed July 2014
I-5 - SR 104 to 52nd Ave. W & I-5 - 220th Interchange Ramps - Paving
I-5 - SR 16 Realignment - HOV Structure and Connections
I-5 - SR 16 Tacoma/Pierce County HOV Program
I-5 - SR 161/SR 18 Triangle Improvements
I-5 - SR 18 to S. 288th Street Seismic Retrofit - Completed Feb. 2015
I-5 - SR 510 Interchange - Reconstruct Interchange
I-5 - SR 510 to SR 512 - ITS Fiber Improvements
I-5 - SR 510 to SR 512 Congestion Management
I-5 - Union, Steamboat, and Ebey Slough Bridges - Special Bridge Repair
I-5 - Vicinity Tumwater Blvd to Gravelly Lake Dr - Paving - Completed August 2015
I-5 Automated Express Lanes - Completed July 2012
I-5 Mount Vernon to Joe Leary Slough - Paving - Completed October 2015
I-5 SB Stillaguamish River Bridge - Major Bridge Rehabilitation - Completed November 2014
I-5/NB SR 531 Vic to Stillaguamish River Vic - Paving & ADA Compliance
I-82 - Red Mountain - Build Interchange
I-82 - South Union Gap Interchange Improvements
I-82 - Terrace Heights Off Ramp - Improvements - Complete June 2010
I-82 - Thrall Road to Manastash
I-82 - US 12 to Valley Mall Blvd Vicinity - Paving
I-82 - US 12 to Yakima Ave - Corridor Improvements
I-90 - Columbia River Vantage Bridge Painting
I-90 - East Fork Issaquah Creek Fish Passage - Completed February 2013
I-90 - Freya Street Interchange - Ramp Improvements
I-90 - Front Street Bridge Girder Replacement
I-90 - Geiger Rd to Spokane Viaduct - PCCP Rehabilitation - Complete July 2013
I-90 - Grant County Line to SR 21 - Completed August 2014
I-90 - Lake Easton Vic to Big Creek Br Vic EB - Replace/Rehab Concrete - Complete October 2012
I-90 - Lake Washington Floating Bridges Anchor Cable Replacement
I-90 - Liberty Lake roundabout - Completed November 2013
I-90 - Lincoln County Line to Salnave Road - Complete September 2014
I-90 - Snoqualmie Pass East - Hyak to Keechelus Dam (Phase 1)
I-90 - Snoqualmie Pass East - Keechelus Dam Vicinity to Stampede Pass Interchange (Phase 2)
I-90 - SR 202 I/C to S Fork Snoqualmie River - Paving
I-90 - Two-Way Transit and HOV Operations
I-90 - Vicinity Liberty Park to Havana - Illumination - Complete November 2014
I-90 - WB East Channel Bridge Expansion Joint Repair - complete August 2014
I-90 - WB Mercer Slough to W Lake Sammamish Parkway - Paving
I-90 - West Lake Sammamish Parkway  - Intersection Modification - Completed November 2013
I-90 Snoqualmie Pass Vicinity - Improve Delineation - Complete September 2014
North Central Region Chip Seal 2014 - Complete September 2014
North Central Region Chip Seal 2015
Rail - Vancouver - Rail Bypass and W. 39th Street Bridge
SR 104 - Hood Canal Bridge Bicycle Enhancements - Completed September 2013
SR 104 and SR 307 North Kitsap Co - Remove Fish Barriers
SR 105 - North River and Smith Creek Bridge Replacements - Complete November 2014
SR 106 - Twanoh Falls Improvements - Complete October 2014
SR 11 - Padden Creek - Fish Barrier Removal - Completed June 2014
SR 112 - Coville Creek - Fish Barrier Removal - Completed October 2013
SR 112 - Joe Creek - Remove Fish Barrier
SR 121 - Blooms Ditch - Remove Fish Barriers
SR 124 - Monument Drive Railroad Crossing - Construct Bridge
SR 14 - 6th St to Bingen - Chip Seal
SR 14 - Camas-Washougal Widening & Interchange  - Complete June 2013
SR 14 - Marble Road Vicinity to Belle Center Road - Safety Improvements - Complete Fall 2013
SR 142 - Klickitat River Bridge - Replace Bridge
SR 150 - 3 Miles East of Manson - Slope Stabilization - Complete May 2011
SR 150 - No See-Um Road Intersection Improvements
SR 155 - South of Electric City - Rock Slopes Scaling - Complete May 2011
SR 155/215 Omak Area - Paving
SR 16 - Anderson Creek Tributary to Sinclair Inlet - Remove Fish Barriers
SR 16 - Eastbound Nalley Valley - Completed August 2014
SR 16 - Olympic Drive NW Bridge - Special Repair - Complete June 2015
SR 16 - Tacoma Narrows Bridges - Paving
SR 16 - Westbound Nalley Valley - Complete June 2011
SR 161 - 24th Street East to Jovita - Completed June 2015
SR 162 - Puyallup River Bridge - Completed October 2015
SR 164 - Hemlock St to SE 408th St - Paving and ADA Compliance - Complete October 2015
SR 164 - High Point St. to Watson St. N Paving and Signalization - Complete January 2015
SR 167 - 8th to 277th Southbound HOT Lane
SR 167 - NB S 277th St to Green River Bridge - Paving - Complete June 2015
SR 167 - Northbound S 212th St to 43rd St Vicinity - Paving
SR 167 - Puyallup River Bridge - Bridge Replacement
SR 167 - Tacoma to Edgewood New Freeway Construction
SR 171 - Moses Lake - Paving Complete August 2011
SR 18 - EB Carey Creek Tributary to Issaquah-Hobart Road Vic - Paving - complete September 2013
SR 18 - EB W Valley Hwy S Vic to C St SW Vicinity - Paving
SR 18 - Green River (Neeley) Bridge Painting - Complete September 2015
SR 18 - SR 99 to Green River Bridge Paving - Complete November 2013
SR 18 - Taylor Creek Scour Protection - Completed September 2014
SR 181 - 180th to Southcenter Boulevard Paving - Complete July 2015
SR 20 - Frostad Rd Vic to Sharpes Corner Vic - Paving - Completed August 2015
SR 20 - Morris Road to Jacobs Road Safety Improvements
SR 20 - Spur - Commercial Ave. to Anacortes Ferry Paving
SR 202 and SR 203/NE 124th St Vic to Tolt River Bridge - Paving & ADA
SR 203 - Coe Clemons Creek - CED
SR 203 - Tolt River Bridge to McDougall St Paving - Completed November 2014
SR 21 - Curlew State Park to North of Rin Con Creek - Completed May 2013
SR 21 - Keller Ferry Replacement - Completed August 2013
SR 21 - Rin Con to Canada - complete September 2013
SR 21 - South Nanamkin Creek-Culvert Replacement - Complete October 2013
SR 241 - Yakima River Bridge - Replacement
SR 243 - Intersection Improvements
SR 26 - Grant County Line to SR 17 Paving - Complete August 2011
SR 26 - SR 24 - Othello Intersection Improvement - Stage 2
SR 27 - 32nd Ave to SR 290 - Complete September 2013
SR 28 - E End of the George Sellar Bridge
SR 28 - US 2/97 Intersection Improvements - Complete August 2011
SR 28 - Wenatchee Eastside Corridor Study
SR 285 - CO Wenatchee Area - Paving
SR 285 - George Sellar Bridge - Additional EB Lane - Complete July 2011
SR 285 - W End George Sellar Bridge - Intersection Improvement
SR 290 - Sullivan Road to Idaho
SR 291 - Division St. to Stevens County Line - Completed October 2013
SR 3 - Belfair Area - Widening and Safety Improvements
SR 302 - Elgin Clifton Rd to SR 16 - Corridor Study
SR 302 - Key Peninsula Highway to Purdy Vicinity - Safety & Congestion - Completed November 2014
SR 302 - N of E Victor Rd - Culvert Replacement
SR 305 - Suquamish Way Intersection Improvement
SR 4 - 3.1 Miles East of US 101 - Culvert Rehabilitation
SR 4 - Kandoll Rd Vic. To West Valley Creek Bridge - BST
SR 410 - Bridge 410/101 Bridge Elements Repair
SR 410 - East of Chinook Pass - Rock Scaling - Complete September 2014
SR 410 - East of Chinook Pass - Wall Repair - Complete October 2015
SR 410 - Nile Valley Landslide - Reconstruct Route - Complete August 2012
SR 410 - Scatter Creek Bridge Seismic Retrofit - Complete Sept. 2014
SR 410/N of Meyers Rd E to 214 Ave E - Paving
SR 411 - First Ave SW to I-5 - Pavement Rehabilitation
SR 432 - SR 4 to Industrial Way Vic - Paving
SR 433 - Lewis and Clark Bridge Painter - Completed 2014
SR 500 - NE 162nd Ave to SE 3rd Ave Vic - Chip Seal
SR 500 - St. Johns Blvd Interchange - Completed November 2013
SR 501 - Gee Creek Br Vic to S 56th Pl - Paving
SR 502 - Widening From I-5 to Battle Ground
SR 503 - Lewis River (Yale) Bridge - Paving
SR 506 - Ryderwood to I-5 - Chip Seal
SR 508 - S Fork Newaukum River Bridge Replacement
SR 509 - S Normandy Road Vic to 174th Intersection - Paving & ADA Compliance - Complete October 2015
SR 509 - SB S 160th St Vic to S 112th St Vic - Paving and ADA Compliance - Complete May 2015
SR 510 - SE of Reservation Rd. - Intersection Improvements - Complete August 2014
SR 510 - Yelm Loop - Phase 1 open October 2010
SR 518 - 24th to I-5 Interchange Paving - Complete August 2015
SR 518 - Concrete Pavement Rehabilitation - Complete September 2013
SR 520 - 108th Ave. NE to West Lake Sammamish Parkway - Paving - Completed Summer 2014
SR 520 - Eastside Transit and HOV Project
SR 520 - Floating Bridge and Landings Project
SR 520 - Pontoon Construction Project
SR 520 - West Approach Bridge North Project
SR 522 - Paradise Lake Road Interchange
SR 522 - Paradise Lake Road to Snohomish River Widening
SR 522 - Snohomish River to US 2, Four Lane Widening - Completed December 2015
SR 527 - I-405 I/C to SR 524 Vicinity Paving - Completed October 2014
SR 529 - Ebey Slough Bridge Replacement - Completed July 2013
SR 529 - Snohomish River Bridge - Special Bridge Repair - Complete October 2013
SR 531 - 43rd Ave. Vic. to Sr 9 Vic. - Paving - Complete October 2013
SR 532 - Davis Slough Bridge Replacement
SR 532 - Pilchuck Creek Tributary (Secret Creek) - Fish Barrier
SR 539 - I-5 to Horton Road - Mobilty Improvements - Complete November 2013
SR 539 - Lynden-Aldergrove Port of Entry Improvements - Complete November 2015
SR 542 - Anderson Creek Culvert
SR 542 - Glacier Springs (Warnick Bluff) Vicinity - Realignment - Completed March 2015
SR 546 - Depot Road and Bender Road - Intersection Improvements - Completed September 2013
SR 548 - Unnamed Creek to Drayton Harbor - Fish Passage
SR 6 - Rock Creek Bridge - East Bridge Replacement
SR 6 - Rock Creek Bridge - West Bridge Replacement
SR 7 - Ohop Vicinity Slide - Emergency Slope Stabilization
SR 704 - Cross-Base Highway Project
SR 823 - Selah Vicinity -  Reroute Highway
SR 9 - 176th Street SE to SR 96 - Paving - Complete September 2013
SR 9 - 212th St SE to 176th St SE - Widening (Stage 3) - Completed September 2013
SR 9 - 32nd St. SE and 84th St. NE Safety Improvements - Completed November 2014
SR 9 - Francis Road - Intersection Improvement
SR 9 - Gribble Creek Fish Passage
SR 9 - Lake Creek - Fish Passage
SR 9 - Pilchuck Creek Bridge Replacement - Completed July 2014
SR 9 - SR 204 Intersection Improvements
SR 9 - SR 92 - Intersection Improvements - Complete August 2012
SR 900 - Tukwila NCL to SR 167 - Concrete Pavement Rehabilitation
SR 92 - 99th Ave NE and 113th Ave NE - Roundabouts - Complete November 2013
SR 92 - Pilchuck River - CED
SR 96 - Dumas Road Channelization - Complete December 2012
SR 99 - Airport Rd. Intersection Transit Queue Bypass Safety Improvements - Completed June 2015
SR 99 - Aurora Ave - George Washington Memorial Br 99/560 (Stage 1)
SR 99 - Aurora Bridge and Column Seismic Retrofit - Completed March 2013
SR 99 - Lincoln Way to Airport Rd - Pedestrian Improvements and Signal - Completed November 2013
SR 99 - Spokane St. Br. to Alaskan Way Viaduct Concrete Pavement Rehab - Complete October 2014
SR 99 - Spokane Street Overcrossing - Complete March 2014
SR 99 - SR 525 Interchange Vic to Lincoln Way Vic - Paving & ADA Compliance
SR 99 - W Fork Hylebos Creek - Fish Passage - Completed October 2015
SR4, Elochoman River Vicinity Culvert Replacements
SR7 - Alder Canyon Emergency Slope Stabilization - Complete October 2013
US 101 - Hoh River Erosion Site #2 - Complete October 2014
US 101 - Hoquiam River - Simpson Avenue Bridge - Bridge Painting
US 101 - Middle Nemah River Bridge Replacement - Completed May 2014
US 101 - N of Salmon Creek Bridge - Stabilize Slope - Complete November 2015
US 101 - Purdy Canyon Vicinity Slope Stabilization - Complete March 2015
US 101 - Shore Rd. to Kitchen-Dick Rd. - Widening - Complete February 2016
US 101 - Simpson Bridge Pier Repair - Complete December 2012
US 101/ 2.2 miles South of Beacon Pt Road - Emergency Slope Stabilization - Complete October 2015
US 12 - A Street and Tank Farm Rd - Interchange Study
US 12 - Chapman Rd Vic to Coal Creek Bridge - Chip Seal
US 12 - E of Clear Creek Falls - Road Washout Repair - Complete June 2014
US 12 - Nine Mile Hill to Frenchtown Vicinity - Build New Highway
US 12 - Old Naches Highway - Build Interchange
US 12 - Salkum Vic to Corn Creek Bridge - Paving
US 12 - Schouweiler Rd Intersection Improvements
US 12 - SR 124 Intersection - Build Interchange - Complete June 2012
US 12 - White Pass Washout
US 12 - Wildcat Creek Bridge - Replace Bridge
US 195 - Babbit Road to Colfax
US 195 - Cheney-Spokane Road Interchange - Complete November 2014
US 195 - Colfax to Dry Creek - Complete August 2015
US 195 - Colfax to Spangle - Add Passing Lanes
US 195 - Excelsior Road to I-90
US 195 - Hatch Road to Interstate 90
US 195 - Plaza to Cornwall Road
US 195 - SR 27 to Babbitt Road - Completed July 2015
US 2  - East of Coles Corner - Box Culvert
US 2 - 97 Lower Sunnyslope Road - Access Control
US 2 - Bickford Ave. Intersection Safety and Culvert Replacement - Completed September 2013
US 2 - Chiwaukum Creek
US 2 - Intersection Improvements at Peshastin
US 2 - Safety Improvements - Rice Road and Fern Bluff Road
US 2 - Stevens Pass - Recessed Plastic Edge Lines - Complete August 2011
US 2 - Stevens Pass - Variable Message Signs - Completed November 2012
US 2 - Stevens Pass East - Paving
US 2 - Stevens Pass West - Unstable Slopes.
US 2 - Wenatchee River Bridge
US 2 - West of Leavenworth - Slope Stabilization - Complete November 2011
US 2 - Westwood Road to Pend Oreille County Line - Complete August 2014
US 395 - Columbia River at Kettle Falls - Bridge Deck
US 395 - Francis Ave to Farwell Rd - Southbound Lanes
US 395 - Lind Rd Vicinity - Intersection Improvements
US 395 - North Spokane Corridor
US 395 - North Spokane Corridor - Parksmith Interchange
US 395 - North Spokane Corridor - US 2 to Wandermere Vicinity
US 395 - NSC - US 2 Lowering
US 97 - Biggs Rapids to Prairie Rd Vic - Paving
US 97 - Biggs Rapids-Sam Hill Bridge - Painting
US 97 - Cameron Lake Road - Intersection Improvement - Complete December 2013
US 97 - Dolarway Intersection - Intersection Improvements
US 97 - N of Daroga State Park - Turn Lanes - Complete September 2013
US 97 - North Blewett Pass - Safety Improvements
US 97 - North of Brewster - Passing Lane - Complete September 2013
US 97 - North of Goldendale - Wildlife Habitat Connectivity - Complete April 2014
US 97 - Orondo Northward Paving - Complete September 2010
US 97 - Satus Creek Bridge - Bridge Replacement - complete October 2013
US 97 - W Wapato Rd to Lateral A - Paving and Replace Single Strand Cable - Complete summer 2013
US 97A - North of Wenatchee - Slope Stabilization - Complete March 2011
US 97A - Wildlife Fence - Complete September 2011
US101 - Bone River Bridge Replacement - Complete November 2013
  • View projects in a county by clicking anywhere in the county.
  • Click on orange marker to view active project information.
  • Click on green marker to view completed project information.
  • Locate a project by clicking on the name in the list.
  • Show Project Page by double-clicking on a project in the list.
  • Okanogan
    Ferry
    Stevens
    Lincoln
    Spokane
    Pend
    Oreille
    Douglas
    Adams
    Whitman
    Garfield
    Asotin
    Columbia
    Walla
    Walla
    Franklin
    Benton
    Grant
    Klickitat
    Yakima
    Kittitas
    Chelan
    Whatcom
    Skagit
    Snohomish
    King
    Pierce
    Thurston
    Lewis
    Kitsap
    Mason
    Clallam
    Jefferson
    Grays
    Harbor
    Pacific
    Wahkiakum
    Cowlitz
    Clark
    Skamania
    Island
    San Juan