All projects
Active Projects
Completed Projects
Project data from the
Transportation Executive Information System
Eastern Region 2012 Chip Seal
Eastern Region Preventative Maintenance Chip Seal - Complete Novembe
I-182 - Road 100 Interchange Improvements - Complete October 2009
I-205 - Mill Plain Exit - 112th Connector - Complete February 2010
I-405 - Concrete Pavement Rehabilitation
I-405 - I-5 to SR 169 Stage 2 Widening - Complete December 2010
I-405 - Kirkland Nickel Stage 1 - Complete November 2007
I-405 - NB SR 167 Ramp to NB I-405 - Major Drainage Repair
I-405 - NE 10th Street Bridge - Complete November 2009
I-405 - NE 116th St Interchange and Street Improvement
I-405 - NE 132nd St. Interchange Improvements
I-405 - NE 195th to SR 527 - Northbound Auxiliary Lane - Complete Au
I-405 - NE 44th to 112th Ave. SE Widening
I-405 - NE 6th to I-5 Widening and Express Toll Lanes
I-405 - NE 8th St to SR 520 Braided Ramps - Interchange Improvements
I-405 - Renton - Slide Repair and Culvert Replacement - Complete Oct
I-405 - South Bellevue Widening - Complete November 2009
I-405 - SR 167 Interchange Direct Connector Project
I-405 - Totem Lake Freeway Station - Complete September 2008
I-5 - 124th St. Bicycle/Pedestrian Overpass - Complete April 2008
I-5 - 172nd Street NE (SR 531 Smokey Point) Interchange Improvements
I-5 - 196th Street (Lynnwood) Braided Ramp
I-5 - 52nd Ave W to SR 526 - NB paving - Complete September 2009
I-5 - 5th Ave. NE to NE 92nd Street Noise Wall - Complete May 2010
I-5 - Active Traffic Management - Complete August 2010
I-5 - Arlington City Limit Vic to Stillaguamish River - Paving Compl
I-5 - Bakerview Road to Nooksack River Bridge - Complete July 2009
I-5 - Blaine Exit Interchange Improvements - Complete September 2010
I-5 - Boeing Access Road to King/Snohomish County Line Pavement Rep
I-5 - Chamber Way - Girder Replacement
I-5 - Clover Creek Bridge - Bridge Deck - Complete July 2011
I-5 - Everett, SR 526 to US 2 HOV Lanes - Complete June 2008
I-5 - Exit 111 - Lacey Vicinity Noise Barriers - Complete December 2
I-5 - Grand Mound to Maytown Stage One - Add Lanes - Complete July 2
I-5 - Grand Mound to Maytown Stage Two - Replace Interchange
I-5 - Guardrail Retrofit - Complete July 2009
I-5 - HOV Improvements - S 48th Street to Pacific Ave - Complete Mar
I-5 - Interstate Bridge to 39th Street - Paving - Complete August 20
I-5 - Joe Leary Slough to Nulle Road Vicinity - Paving Design Build
I-5 - Koontz Rd to Harrison Ave Paving - Complete July 2010
I-5 - Martin Way Overcrossing Bike Lanes - Complete September 2010
I-5 - Martin Way to 48th Street - NB and SB Concrete Pavement Rehabi
I-5 - Marysville to Stillaguamish River - Median Barrier - Complete
I-5 - Mellen Street to Blakeslee Junction
I-5 - Mountlake Terrace Freeway Station - Complete March 2011
I-5 - Nisqually River Bridges - Bridge Painting
I-5 - North Everett to SR 528 - ITS and Paving - Complete December 2
I-5 - North Kelso to Castle Rock Pavement Rehabilitation - Complete
I-5 - North Kelso to Harrison Ave Vicinity - Complete February 2011
I-5 - Pacific Ave. Bridge Girder Replacement - Complete April 2008
I-5 - Pavement - University District Seattle
I-5 - Pavement Repair - Kent / Federal Way
I-5 - Pavement Repair in King County
I-5 - Port of Tacoma Road Interchange to King County Line - HOV Lane
I-5 - Portland Avenue to Port of Tacoma Road - Northbound HOV Stage
I-5 - Reconstruct Interchange at NE 134th (Salmon Creek Interchange
I-5 - Reconstruction Projects - King County
I-5 - Reverse Express Lane to/from SR 522 - Complete July 2010
I-5 - Roanoke Vicinity Noise Wall Project - Complete June 2009
I-5 - Rush Road to 13th Street - Complete June 2009
I-5 - S 272nd St to Southcenter Parkway - Ramp Paving - Complete Jan
I-5 - Samish Way, Northwest Ave to Birch Bay Lynden Rd. Vicinity - T
I-5 - Ship Canal Bridge - Noise Study
I-5 - Snohomish River to Ebey Slough Paving - Complete December 2009
I-5 - South Everett Freeway Station - Complete November 2008
I-5 - Southbound off-ramp to 128th Street SW - Safety Improvements -
I-5 - Spokane St Interchange Vicinity - Special Bridge Repair
I-5 - Spokane Street to I-90 Bridge Repair - Complete October 2007
I-5 - SR 104 to 52nd Ave. W & I-5 - 220th Interchange Ramps - Paving
I-5 - SR 11 Interchange and Josh Wilson Road Realignment - Complete
I-5 - SR 16 Realignment - HOV Structure and Connections
I-5 - SR 16 Tacoma/Pierce County HOV Program
I-5 - SR 161/SR 18 Triangle Improvements
I-5 - SR 432 Talley Way Interchange - Open October 2011
I-5 - SR 501 Ridgefield Interchange - Complete October 2012
I-5 - SR 502 - Interchange - Complete October 2008
I-5 - SR 528 and SR 525 Pedestrian Improvements - Complete October 2
I-5 - SR 532 to Hill Ditch Bridge Concrete Pavement Rehabilitation -
I-5 - SR 532 to Starbird Road - PCCP Rehab - Complete May 2010
I-5 - Travel Time Signs - Alaskan Way Viaduct Replacement - Complete
I-5 - West View School Noise Wall - Complete October 2009
I-5 - Whatcom County Drainage and Water Quality Improvement - Comple
I-5 Automated Express Lanes - Completed July 2012
I-82 - Grandview to Prosser - Dowel Bar Retrofit and Concrete Rehab
I-82 - Naches River Bridge - Bridge Structure Repair - Complete Sept
I-82 - Red Mountain - Build Interchange
I-82 - South Union Gap Interchange Improvements
I-82 - Thrall Road to Manastash
I-82 - US 12 to Yakima Ave - Add Lanes
I-82 - Valley Mall Blvd Interchange - Rebuild Interchange - Complete
I-82 - Yakima River Bridge Vicinity to Granger - Dowel Bar Retrofit
I-82 to SR 397 Intertie - Complete October 2008
I-90 - Altamont & Havana Bridge Deck Repair - Complete July 2011
I-90 - Bellevue Way Interchange Ramps - Paving - Complete July 2010
I-90 - BNRR Bridges to Geiger Blvd
I-90 - Columbia River Vantage Bridge Painting
I-90 - East Fork Issaquah Creek Fish Passage - Completed February 20
I-90 - Eastbound Ramps to SR 18 - Complete November 2007
I-90 - Eastside Bridges - Seismic Retrofit - Complete March 2010
I-90 - EB West Portal Mercer Island Lid - Drainage Repair - Complete
I-90 - Geiger Rd to Spokane Viaduct - PCCP Rehabilitation
I-90 - Highpoint to Preston - New Trail - Complete December 2010
I-90 - Homer Hadley Bridge Repair - Complete July 2009
I-90 - I-5 To 12th Avenue S. Seismic Retrofit - Complete June 2010
I-90 - Lake Easton Vic to Big Creek Br Vic EB - Replace/Rehab Concre
I-90 - Lake Easton Vic to Bullfrog Rd I/C Vic WB - Replace PCCP - Co
I-90 - Latah Creek Bridge & Lindeke St. Bridge - Rail Upgrade - Comp
I-90 - Moses Lake Paving - Complete November 2009
I-90 - Ritzville to Tokio - Paving Outside Lanes - Complete July 201
I-90 - Snoqualmie Pass East - Hyak to Keechelus Dam (Phase 1)
I-90 - Snoqualmie Pass East - Keechelus Dam Vicinity to Cabin Creek
I-90 - Snoqualmie Summit to Hyak WB - Dowel Bar Retrofit/Concrete Re
I-90 - Spokane Area Rut Repair and Ramp Paving - Complete October 20
I-90 - Spokane Port of Entry-Weigh Station Relocation - Complete Sep
I-90 - Spokane to Idaho St Line
I-90 - Sullivan Rd to Barker Rd
I-90 - Sullivan to Idaho State Line-ITS - Complete September 2011
I-90 - Sunset Way Interchange Modifications - Complete November 2010
I-90 - Two-Way Transit and HOV Operations
I-90 - West of George - Paving
I-90 - Westbound Variable Message Sign Replacement - Complete Septem
I-90 at SR 18 bridge deck repair - Completed July 2012
NCR Signal and Illumination Rebuild - Complete August 2011
North Central Region Major Drainage - Complete July 2011
North Central Region Seal 2009 - Complete July 2009
North Central Region Seal 2010 - Complete July 2010
North Central Region Seal 2012
Rail - Everett - Rail Yard and Storage Track Improvements - Complete
Rail - Palouse River and Coulee City RR - Acquisition and Rehabilita
Rail - Vancouver - Rail Bypass and W. 39th Street Bridge
SR 103 - Pedestrian Path - Complete October 2007
SR 104 - Hood Canal Bridge Bicycle Enhancements
SR 104 - Hood Canal Bridge Project - Complete March 2010
SR 105 - North River and Smith Creek Bridge Replacements
SR 106 - Twanoh Falls Improvements
SR 109 - Moclips River Bridge
SR 11 - Padden Creek - Fish Barrier Removal
SR 112 - Coville Creek - Fish Barrier Removal
SR 116 - Portage Canal Bridge Rail Retrofit - Complete February 2008
SR 14 - Camas-Washougal Widening & Interchange
SR 14 - Cape Horn Bridge to Cape Horn Road - Safety Improvements - C
SR 14 - I-5 to SE 164th Interchange - Paving - Complete September 20
SR 14 - Marble Road Vicinity to Belle Center Road - Safety Improveme
SR 14 - Rockfall Mitigation White Salmon Vicinity - Complete Septemb
SR 142 - Little Klickitat River Bridge to US 97 - Paving - Complete
SR 142 - SR 14 to US 97 Roadside Safety - Complete May 2010
SR 150 - 3 Miles East of Manson - Slope Stabilization - Complete May
SR 150 - No See-Um Road Intersection Improvements
SR 155 - South of Electric City - Rock Slopes Scaling - Complete May
SR 155/215 Omak Area - Paving
SR 16 - Eastbound Nalley Valley
SR 16 - HOV Improvements - Olympic Drive to Union Avenue - Complete
SR 16 - HOV Improvements - Stage 3 Union to Jackson - Complete Summe
SR 16 - Westbound Nalley Valley - Complete June 2011
SR 161 - 36th to Jovita - Additional Lanes
SR 162 - Orting Bridge For Kids
SR 162 - Puyallup River Bridge
SR 164 - 158th Avenue SE to High Point Street - Complete July 2007
SR 164 - Route Development Plan - Complete March 2010
SR 167 - 8th to 277th Southbound HOT Lane
SR 167 - I-405 to S Grady Way and SR 509 - 174th to S Normandy Rd -
SR 167 - Northbound Ramps to Ellingson Road - Complete July 2007
SR 167 - Puyallup River Bridge - Bridge Replacement
SR 167 - Tacoma to Edgewood New Freeway Construction
SR 167 - Valley Freeway Corridor Plan - Complete December 2007
SR 169 - Green River Bridge Long Term Repairs - Complete June 2009
SR 169 - Route Development Plan - Complete December 2007
SR 169 - SE 264th St to Witte Road Paving and Concrete Repair - Comp
SR 169 - SE 291st Street Safety Improvements (SE 288th) - Complete
SR 17 - Grant County Airport North Paving - Complete November 2009
SR 17 - Moses Lake North Paving - Complete June 2008
SR 17 - Pioneer Way to Stratford Road - Complete October 2007
SR 17 / SR 282 - Moses Lake to Ephrata - Paving and Passing Lanes -
SR 171 - Moses Lake - Paving Complete August 2011
SR 18 - Green River Bridge - Deck Rehab
SR 18 - Issaquah Hobart Road to I-90
SR 18 - Issaquah-Hobart Rd Retaining Wall Repair - Complete October
SR 18 - Maple Valley to Issaquah Hobart Road - Complete July 2007
SR 18 - Maple Valley to Issaquah Road - Roadside Restoration - Compl
SR 18 - Peasley Canyon Mudslide - Complete October 2010
SR 20 - Cornet Bay Road to Rosario Road - Complete June 2008
SR 20 - Fredonia to Interstate 5 - Additional Lanes - Complete March
SR 20 - Harbor Vista Drive Vicinity to NE Narrows Ave Paving - Compl
SR 20 - Libbey Road to Sidney Street, Realignment and Widening - Com
SR 20 - Morris Road to Jacobs Road Safety Improvements
SR 20 - Quiet Cove Road Vicinity to SR 20 Spur - Complete January 20
SR 20 - Red Cabin Creek - Chronic Environmental Deficiency - Complet
SR 20 - Sidney Street to Scenic Heights - Complete August 2008
SR 20 - Skagit River - Permanent Restoration
SR 20 - Troxell Road Vicinity to Cornet Bay Vicinity - Complete Augu
SR 202 - Preston Fall City Road and Jct SR 203 - Complete July 2008
SR 202 - SR 203 to W North Bend Way - Complete July 2007
SR 202 - SR 520 to Sahalee Way Widening - Complete September 2008
SR 21 - Curlew State Park to North of Rin Con Creek
SR 21 - Keller Ferry Replacement
SR 21 - South Nanamkin Creek-Culvert Replacement
SR 22 - I-82 to Toppenish - Safety Improvements - Complete June 2012
SR 24 - I-82 to Keys Rd - Add Lanes - Complete June 2007
SR 24 - SR 241 to Cold Creek Rd - Add Passing Lanes - Complete Augus
SR 240 - Beloit Rd to Kingsgate Way - Widen Roadway - Complete July
SR 240 - Tri-Cities Additional Lanes - Complete June 2007
SR 240 - Yakima River Bridge - Complete June 2007
SR 241 - Rattlesnake Hills - Roadside Safety - Complete October 2008
SR 241 - Yakima River Bridge - Replacement
SR 243 - Intersection Improvements
SR 25 - Spokane and Columbia Rivers Bridge Rail Upgrade - Thrie Beam
SR 26 - Grant County Line to SR 17 Paving - Complete August 2011
SR 26 - Longmeir Rd. to Dusty - Guardrail Improvements - Complete No
SR 26 - SR 24 - Othello Intersection Improvement - Stage 2
SR 27 - 32nd Avenue to SR 290
SR 27 - Pine Creek Bridge Replacement - Complete October 2010
SR 270 - Pullman to Idaho St Line - Additional Lanes - Complete Spri
SR 28 - E End of the George Sellar Bridge
SR 28 - East Wenatchee Area - Paving - Complete September 2008
SR 28 - Junction US 2/97 to 9th Street - Stage 1
SR 28 - Quincy Area Paving - Complete August 2009
SR 28 - Rock Island Slope Stabilization - Complete December 2008
SR 28 - US 2/97 Intersection Improvements - Complete August 2011
SR 28 - Wenatchee Eastside Corridor Study
SR 28 - West of Ephrata - Paving - Complete October 2007
SR 282 - Ephrata South Paving - Complete November 2009
SR 285 - George Sellar Bridge - Additional EB Lane - Complete July 2
SR 285 - W End George Sellar Bridge - Intersection Improvement
SR 3 - Belfair Area - Widening and Safety Improvements
SR 3 - Belfair Bypass - Alternatives Outreach - Complete June 2010
SR 3 - Unstable Slopes South of SR 304 - Complete October 2011
SR 302 - Elgin Clifton Rd to SR 16 - Corridor Study
SR 302 - Key Peninsula Highway to Purdy Vicinity - Safety & Congesti
SR 303 - Manette Bridge Replacement - Complete February 2012
SR 304 - Bremerton Tunnel - Complete July 2009
SR 305 - Poulsbo South City Limit to Bond Road - Complete November 2
SR 305 - Suquamish Way Intersection Improvement
SR 305 - Unnamed Tributary to Liberty Bay - Fish Barrier - Complete
SR 31 - Pend Oreille River Bridge Deck Repair - Complete November 20
SR 4 - Skamokawa to Coal Creek Road Paving and Guardrail - Complete
SR 4 - Svensen's Curve - Realign Roadway - Complete June 2008
SR 410 - Nile Valley Landslide - Reconstruct Route - Complete August
SR 410 - Nile Valley Landslide Detour - Complete November 2009
SR 432 - Roadside Safety Improvements - Complete July 2008
SR 433 - Lewis and Clark Bridge Painter
SR 500 - St. Johns Blvd Interchange
SR 500 - Thurston Way Interchange - Complete October 2002
SR 502 - 10th Ave. to 72nd Ave - Add Turn Lanes - Complete June 2008
SR 502 - Widening From I-5 to Battle Ground
SR 503 - 4th Plain/ SR 500 Intersection - Add right turn lane
SR 503 - Gabriel Rd Intersection - Complete September 2008
SR 503 - Lewisville Park - Climbing Lanes - Complete October 2010
SR 510 - SE of Reservation Rd. - Intersection Improvements
SR 510 - Yelm Loop - Phase 1 open October 2010
SR 515 - SE 192nd Street to Benson Road: Access and Asphalt - Comple
SR 516 - 208th and 209th Ave SE - Complete August 2007
SR 518 - Concrete Pavement Rehabilitation
SR 518 - SR 509 Interchange Improvements - Complete July 2008
SR 519 - S Seattle Intermodal Access - Complete May 2010
SR 520 - Eastside Quieter Pavement Evaluation Project - Complete Jul
SR 520 - I-405 Vicinity - Seismic Retrofit - Complete December 2011
SR 520 - I-5 to Medina: Bridge Replacement and HOV Project
SR 520 - Medina to SR 202: Eastside Transit and HOV Project
SR 520 - Pontoon Construction Project
SR 520 - West Lake Sammamish Parkway to SR 202 - Open December 2010
SR 520 Floating Bridge and Landings Project
SR 522 - 102nd Ave to Kaysner Way and SR 202 I/C to Sammamish River
SR 522 - I-5 to I-405 - Multimodal Project - NE 153rd Signal and Roa
SR 522 - Paradise Lake Road Interchange
SR 522 - Paradise Lake Road to Snohomish River Widening
SR 522 - Snohomish River to US 2, Four Lane Widening
SR 522 - UW Bothell/Cascadia Community College Campus Access - Compl
SR 525 - Widening & Safety Improvements - Complete October 2006
SR 527- 186th Place SE Signal and Channelization - Complete June 200
SR 529 - Snohomish River Bridge - Special Bridge Repair
SR 529 (Marine View Dr) Paving - Everett Waterfront - Complete July
SR 529 - Ebey Slough Bridge Replacement
SR 530 - Sauk River CED Bank Erosion - Complete November 2008
SR 530 - Skaglund Hill - Permanent Slide Repair
SR 531 - 43rd Ave. Vic. to SR 9 Vic. - Paving
SR 531 - Arlington Corridor - Pre-Design Analysis - Complete March 2
SR 531 Cougar Creek Culvert Replacement - Complete October 2009
SR 532 - Davis Slough Bridge Replacement
SR 539 - Horton Road to Ten Mile Road Widening - Complete August 200
SR 539 - I-5 to Horton Road - Mobility Improvements
SR 539 - Lynden-Aldergrove Port of Entry Improvements
SR 539 - Ten Mile Road to Badger Road Widening - Complete July 2010
SR 542 - Boulder Creek Bridge - Replace Bridge - Complete October 20
SR 542 - Britton Road to Coal Creek Paving - Complete May 2010
SR 542 - Everson Goshen Rd. Vicinity to SR 9 Vicinity - Complete Oct
SR 542 - Fossil Creek to Wells Creek Rd Vicinity - Paving - Complete
SR 542 - Gallup Creek Bridge Replacement - Complete December 2010
SR 542 - Marshall Hill Road Culvert Replacement - Complete October 2
SR 543 - I-5 to Canadian Border - Additional Lanes for Freight - Com
SR 546 - Depot Road and Bender Road - Intersection Improvements
SR 548 - Terrell Creek Fish Passage - Complete September 2011
SR 6 - Chehalis River Riverside Bridge Deck Overlay
SR 6 - Rock Creek Bridge - East Bridge Replacement
SR 6 - Rock Creek Bridge - West Bridge Replacement
SR 6 - Willapa River Bridge - Bridge Replacement
SR 7 - Alder Canyon Emergency Slope Stabilization
SR 7 - Lewis County Roadside Safety Improvements - Complete June 200
SR 704 - Cross-Base Highway Project
SR 8 - US 101 Undercrossing - Seismic Retrofit - Completed October 2
SR 823 - Selah Vicinity - Reroute Highway
SR 9 - 108th Street NE (Lauck Road) - Complete January 2008
SR 9 - 212th St SE to 176th St SE - Widening (Stage 3)
SR 9 - 32nd St. SE and 84th St. NE Safety Improvements
SR 9 - Corridor Planning Study - SR 522 to Schloman Road - Complete
SR 9 - Lake Stevens Road to 20th Street SE - Complete August 2010
SR 9 - Lundeen Parkway to SR 92 - Complete October 2011
SR 9 - Pilchuck Creek Bridge Replacement
SR 9 - Schloman Road to 268th Street NE - Complete November 2008
SR 9 - SR 204 Intersection Improvements
SR 9 - SR 522 to 212th St. SE - SR 524 - Stage 1B and 2 - Complete M
SR 9 - SR 92 - Intersection Improvements - Complete August 2012
SR 900 - SE 78th Street to Newport Way - Complete October 2010
SR 96 - Dumas Road Channelization
SR 96 - Seattle Hill Road Slide Repair - Open January 2008
SR 99 - Aurora Bridge and Column Seismic Retrofit - Completed March
SR 99 - Automated Viaduct Closure Gates System - Complete June 2011
SR 99 - Intelligent Transportation Systems - Complete July 2011
SR 99 - Lincoln Way to Airport Rd - Pedestrian Improvements and Sign
SR 99 - Shoreline Aurora Ave - N Corridor Transit/HOV Lanes
SR 99 - South 284th St to South 272nd St - HOV Lanes - Complete Sept
SR 99 - Spokane Street Overcrossing
US 101 - Astoria Bridge to SR 4 Paving - Complete June 2008
US 101 - Bone River Bridge Replacement
US 101 - Hoh River Erosion Site #2
US 101 - Hoodsport Vicinity - Slope Stabilization - Complete August
US 101 - Lynch Road Interchange
US 101 - Middle Nemah River Bridge Replacement
US 101 - Purdy Canyon Vicinity Slope Stabilization
US 101 - Purdy Creek Bridge - Complete September 2009
US 101 - Shore Rd. to Kitchen-Dick Rd. - Widening
US 101 - Simpson Avenue Bridge Rehabilitation - Complete April 2008
US 101 - Simpson Bridge Pier Repair
US 101 - SR 3 On-Ramp to US 101 Northbound - Complete November 2008
US 101 - W. Fork Hoquiam River Bridge - Complete September 2009
US 101/12 - SR 105 Bridge Rail Retrofit - Complete March 2008
US 12 - A Street and Tank Farm Rd - Interchange Study
US 12 - Allan Road - Intersection Improvements - Complete April 2011
US 12 - Attalia Vicinity - Complete September 2007
US 12 - Frenchtown Vicinity to Walla Walla - Add Lanes - Complete Ju
US 12 - McNary Pool to Attalia - Complete August 2004
US 12 - Naches River North of Yakima - Stabilize Slopes - Complete O
US 12 - Nine Mile Hill to Woodward Canyon Vic (Ph. 7A) - Add Lanes
US 12 - Old Naches Highway - Build Interchange
US 12 - Phase 5: Attalia Vicinity to US 730 (Walla Walla River) - Co
US 12 - SR 124 Intersection - Build Interchange - Complete June 2012
US 12 - SR 124 to McNary Pool - Complete November 2005
US 12 - Tieton River East and West Bridges - Replacement - Complete
US 12 - Wallula to Walla Walla Corridor Study - Complete December 20
US 12 - Widening From SR 124 to Walla Walla
US 195 - Babbit Road to Colfax
US 195 - Cheney-Spokane Road Interchange
US 195 - Cornwall & Mullen Hill Road to I-90-Median Barrier - Comple
US 195 - Hatch Road to Interstate 90
US 195 - Idaho to Colton - Asphalt Paving - Complete July 2010
US 195 - Palouse River Bridge - ADA Modifications - Complete June 20
US 2 - East of Coles Corner - Box Culvert
US 2 - Bickford Ave. Intersection Safety and Culvert Replacement
US 2 - Chiwaukum Creek
US 2 - Dryden - Complete August 2007
US 2 - Ebey Island Viaduct and Ebey Slough Bridge Rehabilitation - C
US 2 - Espanola Road to I-90
US 2 - Euclid Ave. to Francis Ave. - Asphalt Paving - Complete Septe
US 2 - Everett Port/Naval Station to SR 9 Corridor Planning Study
US 2 - Intersection Improvements at Peshastin
US 2 - Leavenworth to Cashmere - Paving - Complete August 2007
US 2 - One Mile East of Index - Slide Repair - Complete August 2009
US 2 - Pickle Farm Road/Gunn Road - Complete November 2007
US 2 - Roadside Safety Improvements - Complete August 2008
US 2 - Safety Improvements - Monroe to Gold Bar - Completed
US 2 - Safety Improvements - Rice Road and Fern Bluff Road
US 2 - South of Orondo - Passing Lane - Complete November 2009
US 2 - Stevens Pass - Recessed Plastic Edge Lines - Complete August
US 2 - Stevens Pass - Variable Message Signs
US 2 - Stevens Pass Summit - Pedestrian Safety - Complete November 2
US 2 - Stevens Pass West - Unstable Slopes.
US 2 - Sultan Westbound Bus Pullout and Sidewalk - Complete August 2
US 2 - Trestle Rehab - Stage 2 - Complete October 2011
US 2 - Wenatchee River Bridge
US 2 - West of Leavenworth - Paver - Complete July 2009
US 2 - West of Leavenworth - Slope Stabilization - Complete November
US 2/97 - Peshastin East Interchange - Complete November 2008
US 395 - Columbia Drive to SR 240 Rebuild Interchange - Complete Oct
US 395 - Columbia River at Kettle Falls - Bridge Deck
US 395 - Francis Ave to Farwell Rd - Southbound Lanes
US 395 - Lee Road to I-90 Paving - Complete July 2011
US 395 - Lind Rd Vicinity - Intersection Improvements
US 395 - Loon Lake to Immel Road Paving - Complete November 2009
US 395 - North Spokane Corridor
US 395 - North Spokane Corridor - Parksmith Interchange
US 395 - North Spokane Corridor - US 2 to Wandermere Vicinity
US 395 - NSC - Francis Avenue to Farwell Road - Complete August 2009
US 395 - NSC - US 2 Lowering
US 395 - Spokane City Limits to Stevens County Line - Complete Augus
US 97 - Biggs Rapids - Sam Hill Bridge Deck Replacement - Complete M
US 97 - Cameron Lake Road - Intersection Improvement
US 97 - Klickitat County - Roadside Safety - Complete July 2008
US 97 - North Blewett Pass - Safety Improvements
US 97 - North of Brewster - Passing Lane
US 97 - North of Goldendale - Wildlife Habitat Connectivity
US 97 - Orondo Northward Paving - Complete September 2010
US 97 - Oroville Vicinity - Paving - Complete September 2007
US 97 - Satus Creek Bridge - Bridge Replacement
US 97 - SR 155 Intersection and Border Vicinity Improvements - Compl
US 97A - North of Wenatchee - Slope Stabilization - Complete March 2
US 97A - Wildlife Fence - Complete September 2011
US2 - US97A - West of Wenatchee - Paving and Intersection Improvemen
US2/97 - Lincoln Rock State Park to Orondo - Paving - Complete Novem
US97 - N of Daroga State Park -Turn Lanes
Click on orange dot to view active project information.
Click on green dot to view completed project information.
View projects in a specific county by clicking anywhere within the county.
Locate a project by clicking on the name in the list.