I-405 - Concrete Pavement Rehabilitation - Complete September 2013
I-405 - NB SR 167 Ramp to NB I-405 - Major Drainage Repair - Complete September 2013
I-405 - NE 132nd St. Interchange Improvements
I-405 - NE 30th St & NE 44th St Ramp Improvements - Completed May 2017
I-405 - NE 6th to I-5 Widening and Express Toll Lanes
I-405 - Northbound Peak-Use Shoulder Lane Project, SR 527 to I-5
I-405 - Renton To Bellevue Project SR 169 to I-90
I-405 - SB SE 8th St to Northup Way Vic - Paving - Completed September 2014
I-405 - SR 167 Interchange Direct Connector Project
I-5 - 93rd Ave SW and Koontz Rd Bridges - Special Repair - Complete June 2017
I-5 - Birch Bay Lynden Rd Bridge 5/834 Bridge Repair - Completed April 2016
I-5 - Chamber Way - Girder Replacement - Completed November 2013
I-5 - Chamber Way Overpass
I-5 - Cowlitz River Bridge to Koontz Rd Vicinity - Paving - Complete Fall 2016
I-5 - Ebey Slough Bridge to SR 531 Interchange - Paving and ADA Compliance
I-5 - Elm St. to North Kelso Ave. Interchange - Illumination Rebuild
I-5 - Everett to SR 528 - Peak Use Shoulder Lane & I/C Improvements
I-5 - Express Lanes Entrances - Electronic Sign Replacement
I-5 - Fisher Creek - Fish Passage
I-5 - Hill Ditch Bridge to Joe Leary Slough - Paving
I-5 - I-205 to North Fork Lewis River Bridge - Rehabilitate Pavement
I-5 - King County Pavement Repair - Complete July 2013
I-5 - M Street to Portland Avenue - HOV
I-5 - Mellen Street to Blakeslee Junction - Complete August 2016
I-5 - Mounts Rd. to Center Dr. - Auxiliary Lane Extension
I-5 - N of Maytown Rd to Martin Way - Paving - Complete August 2017
I-5 - NB Interstate Bridge - South Tower Trunnion Replacements
I-5 - NB MLK Jr Way to NE Ravenna Br - Pavement Repair & More
I-5 - NB Nooksack River to Blaine Paving - Completed October 2016
I-5 - NB S 260th St to Duwamish River Br - Concrete Pavement Rehab and ADA
I-5 - NB Seneca to SR 520 - Mobility Improvements
I-5 - NB SR 531 Vic to Stillaguamish River Vic - Paving & ADA Compliance - Complete August 2016
I-5 - NE 117th St to SR 104 Pavement Repair - Complete November 2015
I-5 - NE 179th Street to N. Fork Lewis River Bridge - Paving - Complete November 2013
I-5 - Nisqually Road SW/JBLM Mounts Road Gate - Signal Completed June 2014
I-5 - Nooksack River Bridges - Painting - Completed August 2015
I-5 - Nulle Road to Iowa St Vicinity Paving Project - Completed August 2016
I-5 - Pavement - University District Seattle - Complete July 2013
I-5 - Portland Avenue to Port of Tacoma Road - Northbound HOV
I-5 - Portland Avenue to Port of Tacoma Road - Northbound HOV Stage 1 - Complete December 2012
I-5 - Reconstruct Interchange at NE 134th  (Salmon Creek Interchange Project) - Completed September 2014
I-5 - S. 272nd St. to S. Rose St. Seismic Retrofit - Complete November 2015
I-5 - Samish Way, Northwest Ave to Birch Bay Lynden Rd. Vicinity - Traveler Information Systems - Completed March 2013
I-5 - SB CD Lane and 356th St. Intersection Improvements
I-5 - SB S 320th St to Duwamish River Bridge - Concrete Pavement Rehab - Completed July 2017
I-5 - Seattle Bridge Repair - Complete June 2014
I-5 - Skagit River Bridge Replacement - Completed July 2014
I-5 - SR 104 to 52nd Ave. W & I-5 - 220th Interchange Ramps - Paving - Completed Summer 2013
I-5 - SR 16 Realignment - HOV Structure and Connections
I-5 - SR 161/SR 18 Triangle Improvements
I-5 - SR 18 to S. 288th Street Seismic Retrofit - Completed Feb. 2015
I-5 - SR 510 to SR 512 Congestion Management
I-5 - Steilacoom-DuPont Rd. to Thorne Lane - Corridor Improvements
I-5 - Union, Steamboat, and Ebey Slough Bridges - Special Bridge Repair - Complete July 2016
I-5 Mount Vernon to Joe Leary Slough - Paving - Completed October 2015
I-5 SB Stillaguamish River Bridge - Major Bridge Rehabilitation - Completed November 2014
I-90 - Adams Co Line to Spokane Co Line - Complete October 2016
I-90 - Columbia River Vantage Bridge Painting - Complete Fall 2016
I-90 - East Fork Issaquah Creek Fish Passage - Completed February 2013
I-90 - Eastgate to SR 900 Peak Use Shoulder Lanes
I-90 - EB E Sunset Way I/C Vic to 436th Ave SE I/C Vic - Pavement Repair
I-90 - Floating Bridges - Replace Anchor Cables
I-90 - Freya Street Interchange - Ramp Improvements - Completed September 2016
I-90 - Front Street Bridge Girder Replacement
I-90 - Geiger Rd to Spokane Viaduct - PCCP Rehabilitation - Complete July 2013
I-90 - Grant County Line to SR 21 - Completed August 2014
I-90 - Lake Washington Floating Bridges Anchor Cable Replacement - Complete September 2015
I-90 - Liberty Lake roundabout - Completed November 2013
I-90 - Lincoln County Line to Salnave Road - Complete September 2014
I-90 - Medical Lake I/C to Geiger I/C
I-90 - North Fork Issaquah Creek Fish Passage
I-90 - Snoqualmie Pass East - Hyak to Keechelus Dam (Phase 1)
I-90 - Snoqualmie Pass East - Keechelus Dam Vicinity to Stampede Pass Interchange (Phase 2)
I-90 - SR 18 Interchange Improvements
I-90 - SR 202 I/C to S Fork Snoqualmie River - Paving - Complete September 2016
I-90 - Two-Way Transit and HOV Operations
I-90 - Viaduct & 3rd Avenue Bridge - Expansion Joints & Special Repairs - Complete July 2017
I-90 - Vicinity Liberty Park to Havana - Illumination - Complete November 2014
I-90 - Wahl Road and BNSF Bridge Deck Repairs - Complete Sept. 2016
I-90 - WB East Channel Bridge Expansion Joint Repair - complete August 2014
I-90 - WB Mercer Slough to W Lake Sammamish Parkway - Paving - Complete October 2016
I-90 - West Lake Sammamish Parkway  - Intersection Modification - Completed November 2013
I-90 Snoqualmie Pass Vicinity - Improve Delineation - Complete September 2014
SB I-5 Bridge Resurfacing near Woodland and Kalama
SR 104 and SR 307 North Kitsap Co - Remove Fish Barriers - Complete February 2016
SR 3 - Belfair Area - Widening and Safety Improvements- Complete November 2017
SR 302 - Key Peninsula Highway to Purdy Vicinity - Safety & Congestion - Completed November 2014
SR 302 - N of E Victor Rd - Culvert Replacement - Complete June 2017
SR 305 - Bainbridge Ferry Terminal - Main Terminal Building Rehabilitation - Completed December 2014
SR 305 - Winslow Ferry to Hostmark St - Safety Improvements
SR 4 - 3.1 Miles East of US 101 - Culvert Rehabilitation - Complete September 2015
SR 4 - 3.1 Miles East of US 101 Culvert Replacement - Completed Nov. 2015
SR 4 - Kandoll Rd Vic. To West Valley Creek Bridge - BST
SR 409 - Columbia River Bridge at Puget Island - Deck Replacement and Painting
SR 410 - Bridge 410/101 Bridge Elements Repair - Complete April 2016
SR 410 - East of Chinook Pass - Rock Scaling - Complete September 2014
SR 410 - East of Chinook Pass - Wall Repair - Complete October 2015
SR 410 - Scatter Creek Bridge Seismic Retrofit - Complete Sept. 2014
SR 410 - SR 167 to 181st St - Paving - Complete September 2016
SR 410 - White River Bridge - Painting
SR 410 - White River Bridge to SR 164 - Paving & ADA Compliance - Completed August 2017
SR 411 - First Ave SW to I-5 - Pavement Rehabilitation
SR 432 (Industrial Way) - SR 433 (Oregon Way) - Intersection Improvements
SR 432 - Cowlitz River Bridge - Deck Repair and Overlay
SR 432 - SR 4 to Industrial Way Vic - Paving
SR 433 - Lewis and Clark Bridge Painter - Completed 2014
SR 500 - Camas - Paving & sidewalk updates
SR 500 - SR 503 to NE 4th Plain Blvd - Paving
SR 500 - St. Johns Blvd Interchange - Completed November 2013
SR 501 - Gee Creek Br Vic to S 56th Pl - Paving - Completed March 2016
SR 501 - I-5 to Port of Vancouver - Intersection and Profile Improvements
SR 501 26th St Ext Vicinity to End of Road - Chip Seal
SR 502 - Widening From I-5 to Battle Ground - Complete June 2016
SR 503 - 3 Miles West of SR 503 Spur - Slope Stabilization
SR 503 - Lewis River (Yale) Bridge - Paving - Completed September 2016
SR 504 - Wooster Creek - Fish Barrier Removal
SR 506 - Ryderwood to I-5 - Chip Seal
SR 508 - S Fork Newaukum River Bridge Replacement
SR 509 - S Normandy Road Vic to 174th Intersection - Paving & ADA Compliance - Complete October 2015
SR 509 - SB S 160th St Vic to S 112th St Vic - Paving and ADA Compliance - Complete May 2015
SR 510 - SE of Reservation Rd. - Intersection Improvements - Complete August 2014
SR 510 - Yelm Loop - New Alignment Phase 2
SR 510 - Yelm Loop - Phase 1 open October 2010
SR 516 - 102nd Pl SE Vic to 132nd Ave SE - Paving & ADA Compliance - Completed July 2017
SR 518 - 24th to I-5 Interchange Paving - Complete August 2015
SR 518 - Des Moines Memorial Drive - Interchange Improvements
SR 520 - 108th Ave. NE to West Lake Sammamish Parkway - Paving - Completed Summer 2014
SR 520 - 148th Ave NE Interchange - Overlake Access Ramp
SR 520 - Floating Bridge and Landings Project - Complete August 2017
SR 520 - West Approach Bridge North Project
SR 522 - Paradise Lake Road Interchange
SR 522 - Paradise Lake Road to Snohomish River Widening
SR 522 - Snohomish River to US 2, Four Lane Widening - Completed December 2015
SR 524 - Great Dane Creek - Fish Passage
SR 524 - Locust & Larch Way - Intersection Improvements
SR 525 - SB Alderwood Mall Pkwy - Intersection Improvements
SR 526 - Et Al 5th Ave Vic to I-5 - Paving, ADA Compliance & Expansion Joints
SR 527 - I-405 I/C to SR 524 Vicinity Paving - Completed October 2014
SR 528 - 55th Dr NE Vic to 83rd Ave NE Vic - Paving & ADA Compliance
SR 529 - Ebey Slough Bridge Replacement - Completed July 2013
SR 529 - NB Steamboat Slough Bridge - Painting
SR 529 - Snohomish River Bridge - Special Bridge Repair - Complete October 2013
SR 530 - I-5 Interchange to SR 9 - Paving and ADA Compliance
SR 531 - 43rd Ave. Vic. to Sr 9 Vic. - Paving - Complete October 2013
SR 531 - Edgecomb Creek - Fish Passage
SR 532 - Church Creek Fish Passage
SR 532 - Pilchuck Creek Tributary (Secret Creek) - Fish Barrier - Complete September 2016
SR 539 - I-5 to Horton Road - Mobility Improvements - Complete November 2013
SR 539 - Lynden-Aldergrove Port of Entry Improvements - Complete November 2015
SR 542 - Anderson Creek Culvert - Complete May 2016
SR 542 - Glacier Springs (Warnick Bluff) Vicinity - Realignment - Completed March 2015
SR 542 - Hedrick Creek - Fish Barrier
SR 542 - High Creek Fish Passage - Complete September 2016
SR 542 - I-5 to Britton Road - Paving, Culvert and ADA Compliance
SR 542 - SR 9 East Junction - Intersection Improvements
SR 546 - Depot Road and Bender Road - Intersection Improvements - Completed September 2013
SR 548 - Kickerville Rd - Intersection Improvements
SR 548 - Unnamed Creek to Drayton Harbor Fish Passage - Completed October 2016
SR 6 - Rock Creek Bridge - West Bridge Replacement - Completed Feb. 2016
SR 7 - Ohop Vicinity Slide - Emergency Slope Stabilization
SR 7 - Paving and Drainage from Morton to Elbe
SR 704 - Cross-Base Highway Project
SR 8 - Middle and East Forks Wildcat Creek - Remove Fish Barriers
SR 823 - Selah Vicinity -  Reroute Highway
SR 9 - 108th St NE - Intersection Improvements
SR 9 - 176th Street SE to SR 96 - Paving - Complete September 2013
SR 9 - 176th Street SE to SR 96 - Widening
SR 9 - 212th St SE to 176th St SE - Widening (Stage 3) - Completed September 2013
SR 9 - 32nd St. SE and 84th St. NE Safety Improvements - Completed November 2014
SR 9 - Francis Road - Intersection Improvement
SR 9 - Gribble Creek Fish Passage
SR 9 - Lake Creek - Fish Passage - Complete March 2016
SR 9 - Pilchuck Creek Bridge Replacement - Completed July 2014
SR 9 - SR 204 Intersection Improvements
SR 900 - Green Creek - Remove Fish Barrier - Completed August 2017
SR 900 - Tukwila NCL to SR 167 - Concrete Pavement Rehabilitation - Complete August 2016
SR 904 - Betz Road to I-90 - Complete September 2014
SR 904 - Mullenix Rd to Betz Rd - Paving
SR 92 - 147th Ave NE to Quarry Rd - I-S Improvements & Paving
SR 92 - 99th Ave NE and 113th Ave NE - Roundabouts - Complete November 2013
SR 92 - Pilchuck River - CED - Completed September 2016
SR 96 - I-5 Interchange Vic to SR 9 Vic - Paving & ADA Compliance
SR 99 - Airport Rd. Intersection Transit Queue Bypass Safety Improvements - Completed June 2015
SR 99 - Aurora Ave - George Washington Memorial Br 99/560 (Stage 1)
SR 99 - Aurora Bridge and Column Seismic Retrofit - Completed March 2013
SR 99 - George Washington Bridge - Painting (Stage 2) & Paving
SR 99 - Lincoln Way to Airport Rd - Pedestrian Improvements and Signal - Completed November 2013
SR 99 - Roy St to N 145th St - Paving & ADA Compliance
SR 99 - Spokane St. Br. to Alaskan Way Viaduct Concrete Pavement Rehab - Complete October 2014
SR 99 - Spokane Street Overcrossing - Complete March 2014
SR 99 - SR 525 Interchange Vic to Lincoln Way Vic - Paving & ADA Compliance - Complete November 2016
SR 99 - W Fork Hylebos Creek - Fish Passage - Completed October 2015
US 101 - Coffee Creek - Remove Fish Barrier
US 101 - Elwha River Bridge - Bridge Replacement
US 101 - Lynch Road - Safety Improvements
US 101 - Matriotti Creek - Remove Fish Barrier - Complete November 2017
US 101 - Middle Nemah River Bridge Replacement - Completed May 2014
US 101 - Purdy Canyon Vicinity Slope Stabilization - Complete March 2015
US 101 - Shore Rd. to Kitchen-Dick Rd. - Widening - Complete February 2016
US 12 - Anderson Rd to Moon Rd - Safety Improvement
US 12 - Chapman Rd Vic to Coal Creek Bridge - Chip Seal
US 12 - Coal Creek Bridge to Gulch Bridge - Paving
US 12 - E of Clear Creek Falls - Road Washout Repair - Complete June 2014
US 12 - Nine Mile Hill to Frenchtown Vic - Build new highway
US 12 - Oakville City Limits to Huntington St SW - Safety Improvements - Complete September 2016
US 12 - Old Naches Highway - Build Interchange
US 12 - Salkum Vic to Corn Creek Bridge - Paving
US 12 - Schouweiler Rd Intersection Improvements - Complete December 2016
US 12 - Unnamed Tributary to Wynoochee River - Remove Fish Barrier
US 12 - W of Porter - Emergency Slope Stabilization - Complete September 2016
US 12 - White Pass Washout - Complete September 2016
US 12 - Wildcat Creek Bridge - Replace Bridge
US 195 - Cheney-Spokane Road Interchange - Complete November 2014
US 195 - Colfax to Dry Creek - Complete August 2015
US 195 - Colfax to Spangle - Add Passing Lanes
US 195 - Hatch Road to Interstate 90
US 195 - SR 27 to Babbitt Road - Completed July 2015
US 2  - East of Coles Corner - Box Culvert - Complete September 2013
US 2 - 97 Lower Sunnyslope Road - Access Control - Completed October 2016
US 2 - Bickford Ave. Intersection Safety and Culvert Replacement - Completed September 2013
US 2 - Chiwaukum Creek - Complete November 2013
US 2 - Deer Road to Day Mt Spokane Rd
US 2 - Eagle Falls Vic to Tye Creek - Resurfacing - Completed October 2017
US 2 - Fern Bluff Rd Vic to 10th St Vic - Paving and ADA Compliance - Completed November 2017
US 2 - Francis Ave to Division Wye - Paving
US 2 - I-5 Interchange to Bickford Ave Vic - Paving
US 2 - Spotted Road to I-90 - ITS - Complete November 2016
US 2 - Stevens Pass East - Paving - Complete October 2014
US 2 - Stevens Pass West - Unstable Slopes - Complete September 2014
US 2 - Wenatchee River Bridge - Complete October 2014
US 2 - Westwood Road to Pend Oreille County Line - Complete August 2014
US 395 - Arden to Colville - Paving
US 395 - Hawthorne Road - Intersection Improvements - Completed Sept. 2016
US 395 - North Spokane Corridor
US 395 - North Spokane Corridor - Freya Structures
US 395 - North Spokane Corridor - US 2 to Wandermere Vicinity
US 395 - NSC - Wellesley Ave. & Freya St. Intersection Improvements - Completed Oct. 2016
US 395 - US 195 Bridge Expansion Joint Replacement - Complete July 2017
US 97 - Biggs Rapids to Prairie Rd Vic - Paving - Completed November 2016
US 97 - Biggs Rapids-Sam Hill Bridge - Painting - Complete November 2015
US 97 - Cameron Lake Road - Intersection Improvement - Complete December 2013
US 97 - N of Daroga State Park - Turn Lanes - Complete September 2013
US 97 - North of Brewster - Passing Lane - Complete September 2013
US 97 - North of Goldendale - Wildlife Habitat Connectivity - Complete April 2014
US 97 - Satus Creek Bridge - Bridge Replacement - complete October 2013
US 97 - W Wapato Rd to Lateral A - Paving and Replace Single Strand Cable - Complete summer 2013
US 97 and SR 14 Paving - Klickitat County
US101 - Bone River Bridge Replacement - Complete November 2013
  • View projects in a county by clicking anywhere in the county.
  • Click on orange marker to view active project information.
  • Click on green marker to view completed project information.
  • Locate a project by clicking on the name in the list.
  • Show Project Page by double-clicking on a project in the list.
  • Okanogan
    Ferry
    Stevens
    Lincoln
    Spokane
    Pend
    Oreille
    Douglas
    Adams
    Whitman
    Garfield
    Asotin
    Columbia
    Walla
    Walla
    Franklin
    Benton
    Grant
    Klickitat
    Yakima
    Kittitas
    Chelan
    Whatcom
    Skagit
    Snohomish
    King
    Pierce
    Thurston
    Lewis
    Kitsap
    Mason
    Clallam
    Jefferson
    Grays
    Harbor
    Pacific
    Wahkiakum
    Cowlitz
    Clark
    Skamania
    Island
    San Juan