Projects in the 2019 As Passed Legislature, LTC (5/2/2019)
US 2/Spotted Rd to I-90 - ITS
US 2/East Wenatchee N - Access Control
US 2/Wenatchee River Bridge - Replace Bridge
US2/Stevens Pass -- ITS Emergency Power
SR 4/Abernathy Creek Br - Replace Bridge
Expanded CVISN-automated Infrared Roadside Screening
I-5/NE 134th St Interchange (I-5/I-205) - Rebuild Interchange
I-5/SR 432 Talley Way Interchanges - Rebuild Interchanges
I-5/Chehalis River Flood Control
I-5/Mellen Street I/C to Grand Mound I/C - Add Lanes
I-5/North Everett to SR 528 - ITS
SR 6/Willapa River Br - Replace Bridge
SR 6/Rock Creek Br E - Replace Bridge
SR 6/Rock Creek Br W - Replace Bridge
SR 9/Pilchuck Creek - Replace Bridge
SR 9/84th St NE (Getchell Road) Improve Intersection
SR 9/SR 528 - Improve Intersection
US 12/Tieton River W Crossing - Replace Bridge
US 12/Old Naches Highway - Build Interchange
US 12/Frenchtown Vicinity to Walla Walla - Add Lanes
US 12/Nine Mile Hill to Woodward Canyon Vic - Build New Highway
US 12/SR 124 Intersection - Build Interchange
SR 14/Camas Washougal - Add Lanes and Build Interchange
SR 14/Traveler Information Enhancements Phase II
SR 17/Adams Co Line - Access Control
SR 20/Oak Harbor and SR 20 Spur to Pulver Rd - Signal Integration
SR 24/I-82 to Keys Rd - Add Lanes
SR 28/Jct US 2 and US 97 to 9th St, Stage 1 - New Alignment
SR 28/E Wenatchee - Access Control
SR 28/E End of the George Sellar Bridge - Construct Bypass
SR 28/Wenatchee to I-90 - Study
I-82/Red Mountain Vicinity - Pre-Design Analysis
I-82/Valley Mall Blvd - Rebuild Interchange
I-82/South Union Gap I/C - Improvements
I-82/US 12 Interchange to Yakima Ave - Add lanes and Replace Bridges
I-90/Spokane to Idaho State Line - Corridor Design
I-90/Sprague Rest Area Traveler Information
US 97/North of Brewster - Passing Lane
US 101/Dawley Rd Vic to Blyn Highway - Add Climbing Lane
US 101/Gardiner Vicinity - Add Climbing Lane
US 101/Shore Rd to Kitchen Rd - Widening
SR 109/Moclips River Bridge - Replace Bridge
US 195/Spring Flat Creek - Bridge Replacement
I-205/Mill Plain Interchange to NE 18th St - Build Interchange - Stage 2
SR 240/Richland Y to Columbia Center I/C - Add Lanes
SR 285/W End of George Sellar Bridge - Intersection Improvements
SR 290/Spokane River E Trent Br - Replace Bridge
US 395/North Spokane Corridor
SR 500/St Johns Blvd - Build Interchange
SR 502/I-5 to Battle Ground - Add Lanes
SR 503 ATIS Infill-I/S Bypass; 4th Plain to Main St. and Signal Study
SR 529/Ebey Slough Bridge - Replace Bridge
SR 531/43rd Ave NE to 67th Ave. NE - Widening
SR 532/General Mark W. Clark Memorial Bridge - Replace Bridge
SR 539/Lynden-Aldergrove Port of Entry Improvements
SR 542/Everson Goshen Rd Vic to SR 9 Vic - Intersections Improvements
Transportation Executive Information System
  • Click on a blue marker to view project information.
  • View projects in a specific legislative district by clicking anywhere within the district.
  • Locate a project by clicking on the name in the list.