Projects in the 2019 As Passed Legislature, LTC (5/2/2019)
US 2/Spotted Rd to I-90 - ITS
US 2/East Wenatchee N - Access Control
US 2/Wenatchee River Bridge - Replace Bridge
US2/Stevens Pass -- ITS Emergency Power
SR 3/Belfair Area - Widening and Safety Improvements
SR 4/Abernathy Creek Br - Replace Bridge
Expanded CVISN-automated Infrared Roadside Screening
I-5/SR 510 to SR 512 - Mobility Improvements
I-5/NE 134th St Interchange (I-5/I-205) - Rebuild Interchange
I-5/SR 432 Talley Way Interchanges - Rebuild Interchanges
I-5/Chehalis River Flood Control
I-5/Mellen Street I/C to Grand Mound I/C - Add Lanes
I-5/SR 525 Interchange Phase
I-5/Tacoma HOV Improvements (Nickel/TPA)
I-5/SR 161/SR 18 Interchange Improvements - Stage 2
I-5/SR 161/SR 18 - Interchange Improvements
I-5/SB N 145th St Vicinity - Variable Message Sign Installation
I-5/NB Seneca St to SR 520 - Mobility Improvements
I-5/North Everett to SR 528 - ITS
I-5/Mercer Street NB and SB Ramp Meter Systems
I-5/Ship Canal Bridge - Noise Mitigation Study
SR 6/Willapa River Br - Replace Bridge
SR 6/Rock Creek Br E - Replace Bridge
SR 6/Rock Creek Br W - Replace Bridge
SR 9/212th St SE to 176th St SE, Stage 3 - Add Lanes
SR 9/176th Street SE to SR 96 - Widening
SR 9/SR 96 to Marsh Rd - Add Lanes and Improve Intersections
SR 9/Pilchuck Creek - Replace Bridge
SR 9/84th St NE (Getchell Road) Improve Intersection
SR 9/Lake Stevens Way to 20th St SE - Improve Intersection
SR 9/SR 528 - Improve Intersection
US 12/Tieton River W Crossing - Replace Bridge
US 12/Old Naches Highway - Build Interchange
US 12/Frenchtown Vicinity to Walla Walla - Add Lanes
US 12/Nine Mile Hill to Woodward Canyon Vic - Build New Highway
US 12/SR 124 Intersection - Build Interchange
SR 14/Camas Washougal - Add Lanes and Build Interchange
SR 14/Traveler Information Enhancements Phase II
SR 17/Adams Co Line - Access Control
SR 18/Issaquah/Hobart Rd to Tigergate - Add Lanes
SR 18/Tigergate to I-90 - Add Lanes
SR 18/WB Ramps and SE 304th Street Intersection
SR 20/Oak Harbor and SR 20 Spur to Pulver Rd - Signal Integration
SR 24/I-82 to Keys Rd - Add Lanes
SR 28/Jct US 2 and US 97 to 9th St, Stage 1 - New Alignment
SR 28/E Wenatchee - Access Control
SR 28/E End of the George Sellar Bridge - Construct Bypass
SR 28/Wenatchee to I-90 - Study
I-82/Red Mountain Vicinity - Pre-Design Analysis
I-82/Valley Mall Blvd - Rebuild Interchange
I-82/South Union Gap I/C - Improvements
I-82/US 12 Interchange to Yakima Ave - Add lanes and Replace Bridges
I-90/Spokane to Idaho State Line - Corridor Design
I-90/Snoqualmie Pass East - Hyak to Keechelus Dam - Corridor Improvement
I-90/Sprague Rest Area Traveler Information
US 97/North of Brewster - Passing Lane
SR 99/Viaduct Project - Construction Mitigation
SR 99/Alaskan Way Viaduct - Replacement
SR 99/Aurora Bridge - Painting
US 101/Dawley Rd Vic to Blyn Highway - Add Climbing Lane
US 101/Gardiner Vicinity - Add Climbing Lane
US 101/Shore Rd to Kitchen Rd - Widening
US 101/Lynch Road - Safety Improvements
SR 109/Moclips River Bridge - Replace Bridge
SR 161/36th to Vicinity 24th St E - Widen to 5 lanes
SR 161/24th St E to Jovita - Add Lanes
SR 162/Orting Area - Construct Pedestrian Evacuation Crossing
SR 167/8th St E Vic to S 277th St Vic - Southbound Managed Lane
US 195/Spring Flat Creek - Bridge Replacement
I-205/Mill Plain Interchange to NE 18th St - Build Interchange - Stage 2
SR 240/Richland Y to Columbia Center I/C - Add Lanes
SR 285/W End of George Sellar Bridge - Intersection Improvements
SR 290/Spokane River E Trent Br - Replace Bridge
Eagle Harbor Maint Facility Preservation
US 395/North Spokane Corridor
I-405/Kirkland Vicinity Stage 2 - Widening (Nickel/TPA)
I-405/SR 181 to SR 167 - Widening
I-405/SR 167 Interchange - Direct Connector
I-405/South Renton Vicinity Stage 2 - Widening (Nickel/TPA)
I-405/I-90 to SE 8th St - Widening
I-405/NE 8th St to SR 520 Braided Ramps - Interchange Improvements
SR 500/St Johns Blvd - Build Interchange
SR 502/I-5 to Battle Ground - Add Lanes
SR 503 ATIS Infill-I/S Bypass; 4th Plain to Main St. and Signal Study
SR 509/I-5 to Sea-Tac Freight and Congestion Relief
SR 510/Yelm Loop - New Alignment
SR 512/SR 7 to I-5 - Congestion Management
SR 516/Wax Rd to 185th Ave SE - Improvements
SR 522/Snohomish River Bridge to US 2 - Add Lanes
SR 522/I-5 to I-405 - Multimodal Improvements
SR 529/Ebey Slough Bridge - Replace Bridge
SR 531/43rd Ave NE to 67th Ave. NE - Widening
SR 532/General Mark W. Clark Memorial Bridge - Replace Bridge
SR 539/Lynden-Aldergrove Port of Entry Improvements
SR 542/Everson Goshen Rd Vic to SR 9 Vic - Intersections Improvements
SR 704/Cross Base Highway - New Alignment
Transportation Executive Information System
  • Click on a blue marker to view project information.
  • View projects in a county by clicking anywhere within the county.
  • Locate a project by clicking on the name in the list.
  • View project detail by double clicking a name in the list.
  • Okanogan
    Ferry
    Stevens
    Lincoln
    Spokane
    Pend
    Oreille
    Douglas
    Adams
    Whitman
    Garfield
    Asotin
    Columbia
    Walla
    Walla
    Franklin
    Benton
    Grant
    Klickitat
    Yakima
    Kittitas
    Chelan
    Whatcom
    Skagit
    Snohomish
    King
    Pierce
    Thurston
    Lewis
    Kitsap
    Mason
    Clallam
    Jefferson
    Grays
    Harbor
    Pacific
    Wahkiakum
    Cowlitz
    Clark
    Skamania
    Island
    San Juan