US 2/Chiwaukum Creek - Replace Bridge |
The Existing roadway across the bridge is narrow. Replace the existing bridge with a new bridge designed to current standards. The added width will increase the safety for the traveling public. |
Project Costs: |
Phase | From - To | Prior | 17-19 | 19-21 | 21-23 | 23-25 | 25-27 | 27-29 | Future | Total |
---|---|---|---|---|---|---|---|---|---|---|
Preliminary Engineering | Jan-06 - May-11 | 1,007,000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1,007,000 |
Construction | Jun-11 - Apr-15 | 5,419,000 | 1,000 | 0 | 0 | 0 | 0 | 0 | 0 | 5,420,000 |
Project Totals: | 6,426,000 | 1,000 | 0 | 0 | 0 | 0 | 0 | 0 | 6,427,000 |