TEIS Home TEIS
Home
State Corridor Safety and Positive Train Control Compliance
State funds are reserved for state costs to support federally mandated System Safety Plans, Positive Train Control Implementation, and other safety requirements on the Cascades corridor. FRA issued a mandate that commuter and intercity passenger railroads develop and implement a system safety program (SSP) to improve the safety of their operations. The SSP is required by 2018. The The Federal deadline for PTC was extended from December 2015 to December 2018. PTC implementation for the HSR program is federally eligible, however, with the federal PTC extension, the testing and commissioning activities may occur outside the ARRA funding eligibility period (July 2017).
 PIN#:  HSR001
 DOT Region:  Headquarters
 Counties:  
 State Route:  000
 Location:  
 Leg Districts:  
 Program / SubProgram:  Public Transportation and Rail
 Sub-Program:  Rail Passenger Capital
 Sub-Category:  
 Improvement Type:  
 Mile Posts: 0 to 0    
  Project Costs:
Phase From - To Prior 15-17 17-19 19-21 21-23 23-2525-27 Future Total
Construction Jul-17 - Jul-17 001,000,000500,00000001,500,000
  Project Totals:  0 0 1,000,000 500,000 0 00 0 1,500,000