TEIS Home TEIS
Home
Statewide - Washington Produce Rail Car Pool
There is a shortage of refrigerated railcars available to Washington growers during peak seasons. This project will create a fleet of refrigerated railcars. This will result in lower costs to growers and reduce the wear and tear on state roadways caused by heavy truckloads.
 PIN#:  701301A
 DOT Region:  
 Counties:  
 State Route:  000
 Location:  Statewide
 Leg Districts:  
 Program / SubProgram:  Public Transportation and Rail
 Sub-Program:  Essential Rail Assistance and Banking
 Sub-Category:  
 Improvement Type:  Rail
 Mile Posts: 0 to 0    
  Project Costs:
Phase From - To Prior 15-17 17-19 19-21 21-23 23-2525-27 Future Total
Preliminary Engineering Jul-05 - Jul-12 1,137,0000467,000000001,604,000
Construction Aug-05 - Jun-13 370,0000000000370,000
  Project Totals:  1,507,000 0 467,000 0 0 00 0 1,974,000