US 195/Colfax to Dry Creek - Paving
Asphalt concrete pavement requires rehabilitation on a 10 to 15-year cycle to preserve the roadway structure and the public investment in highways. Rehabilitation with a hot mix asphalt pavement application shall be accomplished over this section of roadway. The basic safety features within the project limits shall be upgraded to maintain safe highway operations.
 PIN#:  619503A   Project Page
 DOT Region:  Eastern
 Counties:  Whitman
 State Route:  195
 Location:  Colfax North   Locate Project
 Leg Districts:  09
 Program / SubProgram:  Preservation
 Sub-Program:  Roadway Preservation
 Sub-Category:  Paving
 Improvement Type:  Hot Mix Asphalt (aka ACP)
 Mile Posts: 37.55 to 44.4    
  Project Costs:
Phase From - To Prior 15-17 17-19 19-21 21-23 23-2525-27 Future Total
Preliminary Engineering Oct-13 - Jun-15 374,0000000000374,000
Construction Apr-15 - Sep-16 660,0001,894,0000000002,554,000
  Project Totals:  1,034,000 1,894,000 0 0 0 00 0 2,928,000