US 2/Jct I-90 to Euclid Ave - Paving
Asphalt concrete pavement requires rehabilitation on a 10 to 15-year cycle to preserve the roadway structure and the public investment in highways. Rehabilitation with a hot mix asphalt pavement application shall be accomplished over this section of roadway. The basic safety features within the project limits shall be upgraded to maintain safe highway operations.
 PIN#:  600228R   Project Page
 DOT Region:  Eastern
 Counties:  Spokane
 State Route:  002
 Location:  City of Spokane   Locate Project
 Leg Districts:  03, 06
 Program / SubProgram:  Preservation
 Sub-Program:  Roadway Preservation
 Sub-Category:  Paving
 Improvement Type:  Hot Mix Asphalt (aka ACP)
 Mile Posts: 286.87 to 289.19    
  Project Costs:
Phase From - To Prior 15-17 17-19 19-21 21-23 23-2525-27 Future Total
Preliminary Engineering Mar-16 - Feb-18 0236,00091,00000000327,000
Construction Dec-17 - Aug-19 004,107,000000004,107,000
  Project Totals:  0 236,000 4,198,000 0 0 00 0 4,434,000