SR 105/North River Br - Replace Bridge |
Current bridge is a timber bridge supported by deteriorating timber piling. Current bridge can't carry the weight of larger, heavier trucks due to deterioration of the bridge support piling. Replacing existing bridge with one that can support the weight of the heavier trucks so they don't have to take a longer alternative route. |
Project Costs: |
Phase | From - To | Prior | 15-17 | 17-19 | 19-21 | 21-23 | 23-25 | 25-27 | Future | Total |
---|---|---|---|---|---|---|---|---|---|---|
Preliminary Engineering | Jun-06 - Sep-12 | 2,155,000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2,155,000 |
Right of Way | Apr-11 - Dec-12 | 34,000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 34,000 |
Construction | Jul-12 - May-16 | 10,477,000 | 473,000 | 0 | 0 | 0 | 0 | 0 | 0 | 10,950,000 |
Project Totals: | 12,666,000 | 473,000 | 0 | 0 | 0 | 0 | 0 | 0 | 13,139,000 |