TEIS Home TEIS
Home
SR 162/Puyallup River Bridge - Replace Bridge
The existing bridge is structurally deficient. This project constructs a new bridge replacing the existing structurally deficient bridge, preserving the structural and functional integrity of this section of highway.
 PIN#:  316219A   Project Page
 DOT Region:  Olympic
 Counties:  Pierce
 State Route:  162
 Location:  Orting   Locate Project
 Leg Districts:  31
 Program / SubProgram:  Preservation
 Sub-Program:  Structures Preservation
 Sub-Category:  Structures Preservation
 Improvement Type:  Bridge Replacement (Structural)
 Mile Posts: 6.61 to 7.1    
  Project Costs:
Phase From - To Prior 15-17 17-19 19-21 21-23 23-2525-27 Future Total
Preliminary Engineering Nov-05 - Feb-15 2,985,00000000002,985,000
Right of Way Jan-10 - May-15 710,0002,000000000712,000
Construction Dec-14 - Jul-17 4,220,0002,552,0000000006,772,000
  Project Totals:  7,915,000 2,554,000 0 0 0 00 0 10,469,000