SR 112/Deep Creek to West Twin River - Unstable Slope Corridor Study |
SR 112 has experienced several large and small landslide events over the past 40 years and such landslides will continue to increase roadway damage. This project will develop a real-time landslide monitoring network at a number of sites along this corridor of unstable slopes. |
Project Costs: |
Phase | From - To | Prior | 15-17 | 17-19 | 19-21 | 21-23 | 23-25 | 25-27 | Future | Total |
---|---|---|---|---|---|---|---|---|---|---|
Preliminary Engineering | Aug-06 - Sep-15 | 348,000 | 32,000 | 21,000 | 21,000 | 0 | 0 | 0 | 0 | 422,000 |
Project Totals: | 348,000 | 32,000 | 21,000 | 21,000 | 0 | 0 | 0 | 0 | 422,000 |