![]() |
TEIS Home |
|
SR 20/Deception Pass Park Vic to Lunz Rd Vic - Paving |
Resurfaces deteriorating asphalt pavement (due to rutting, cracking, and normal wear) with an asphalt overlay. Extends the service life of the existing pavement. |
Project Costs: |
Phase | From - To | Prior | 15-17 | 17-19 | 19-21 | 21-23 | 23-25 | 25-27 | Future | Total |
---|---|---|---|---|---|---|---|---|---|---|
Preliminary Engineering | Sep-13 - May-15 | 319,000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 319,000 |
Construction | Mar-15 - Mar-16 | 1,829,000 | 795,000 | 0 | 0 | 0 | 0 | 0 | 0 | 2,624,000 |
Project Totals: | 2,148,000 | 795,000 | 0 | 0 | 0 | 0 | 0 | 0 | 2,943,000 |