I-5 SB 88th St Off Ramp Vicinity to SR 531 SB On Ramp Vicinity - Paving |
This project will mill and fill the roadway and ramps on this section of I-5 with HMA from MP 198.87 to MP 205.27, including bridges 5/651W and 5/658W. Required safety work will include installing shoulder rumble strip as applicable, striping, and other minor safety items as needed. |
Project Costs: |
Phase | From - To | Prior | 15-17 | 17-19 | 19-21 | 21-23 | 23-25 | 25-27 | Future | Total |
---|---|---|---|---|---|---|---|---|---|---|
Preliminary Engineering | Nov-14 - Dec-16 | 143,000 | 160,000 | 0 | 0 | 0 | 0 | 0 | 0 | 303,000 |
Construction | Jan-17 - Apr-18 | 0 | 349,000 | 3,378,000 | 0 | 0 | 0 | 0 | 0 | 3,727,000 |
Project Totals: | 143,000 | 509,000 | 3,378,000 | 0 | 0 | 0 | 0 | 0 | 4,030,000 |