TEIS Home TEIS
Home
Seismic Bridges Program - High & Med. Risk (TPA)
Sesimic Bridges Program. Seismically vunerable bridges will be addressed within funding limits based on priority need.
 PIN#:  099955H
 DOT Region:  Headquarters
 Counties:  
 State Route:  000
 Location:     Locate Project
 Leg Districts:  
 Program / SubProgram:  Preservation
 Sub-Program:  Structures Preservation
 Sub-Category:  Catastrophic Reduction
 Improvement Type:  Seismic
 Mile Posts: 0 to 0    
  Project Costs:
Phase From - To Prior 15-17 17-19 19-21 21-23 23-2525-27 Future Total
Preliminary Engineering Jun-09 - Jun-11 7,286,00000000007,286,000
Construction Apr-11 - May-15 43,875,000220,0006,0000000044,101,000
  Project Totals:  51,161,000 220,000 6,000 0 0 00 0 51,387,000