SR 904/Mullenix Rd to Betz Rd - Paving
Asphalt concrete pavement requires rehabilitation on a 10 to 15-year cycle to preserve the roadway structure and the public investment in highways. Rehabilitation with a hot mix asphalt pavement application shall be accomplished over this section of roadway. The basic safety features within the project limits shall be upgraded to maintain safe highway operations.
 PIN#:  690400J   Project Page
 DOT Region:  Eastern
 Counties:  Spokane
 State Route:  904
 Location:  Cheney   Locate Project
 Leg Districts:  06
 Program / SubProgram:  Preservation
 Sub-Program:  Roadway Preservation
 Sub-Category:  Paving
 Improvement Type:  Hot Mix Asphalt (aka ACP)
 Mile Posts: 9.1 to 12.74    
  Project Costs:
Phase From - To Prior 15-17 17-19 19-21 21-23 23-2525-27 Future Total
Preliminary Engineering Sep-15 - Jul-17 0183,000000000183,000
Construction Apr-17 - Dec-18 0289,0001,536,000000001,825,000