TEIS Home TEIS
Home
SR 290/Sullivan Rd to Idaho State Line - Paving
Asphalt concrete pavement requires rehabilitation on a 10 to 15-year cycle to preserve the roadway structure and the public investment in highways. Rehabilitation with a hot mix asphalt pavement application shall be accomplished over this section of roadway. The basic safety features within the project limits shall be upgraded to maintain safe highway operations.
 PIN#:  629001K   Project Page
 DOT Region:  Eastern
 Counties:  Spokane
 State Route:  290
 Location:  East of Spokane   Locate Project
 Leg Districts:  04
 Program / SubProgram:  Preservation
 Sub-Program:  Roadway Preservation
 Sub-Category:  Paving
 Improvement Type:  Hot Mix Asphalt (aka ACP)
 Mile Posts: 10.35 to 18.38    
  Project Costs:
Phase From - To Prior 15-17 17-19 19-21 21-23 23-2525-27 Future Total
Preliminary Engineering Oct-13 - Jun-15 352,0000000000352,000
Construction Apr-15 - Aug-16 1,042,0003,071,0000000004,113,000
  Project Totals:  1,394,000 3,071,000 0 0 0 00 0 4,465,000