SR 290/Hamilton St to Mission Ave - Paving
Asphalt concrete pavement requires rehabilitation on a 10 to 15-year cycle to preserve the roadway structure and the public investment in highways. Rehabilitation with a hot mix asphalt pavement application shall be accomplished over this section of roadway. The basic safety features within the project limits shall be upgraded to maintain safe highway operations.
 PIN#:  629000O
 DOT Region:  Eastern
 Counties:  Spokane
 State Route:  290
 Location:  Spokane   Locate Project
 Leg Districts:  03
 Program / SubProgram:  Preservation
 Sub-Program:  Roadway Preservation
 Sub-Category:  Paving
 Improvement Type:  Hot Mix Asphalt (aka ACP)
 Mile Posts: 0.74 to 3.34    
  Project Costs:
Phase From - To Prior 15-17 17-19 19-21 21-23 23-2525-27 Future Total
Preliminary Engineering Sep-16 - Jul-18 00196,00000000196,000
Construction May-18 - Oct-19 001,926,0002,00000001,928,000
  Project Totals:  0 0 2,122,000 2,000 0 00 0 2,124,000