TEIS Home TEIS
Home
I-90/Spokane to Idaho State Line - Corridor Design
Interstate 90 is heavily congested east of Spokane. Preliminary design work to investigate widening the roadway to three lanes in each direction from Sullivan Road to the Idaho State Line including potential interchange improvements throughout the corridor. Individual sections of the corridor will be designed and constructed under separate projects and will increase capacity and reduce travel time and delays.
 PIN#:  609049B   Project Page
 DOT Region:  Eastern
 Counties:  Spokane
 State Route:  090
 Location:  Spokane East   Locate Project
 Leg Districts:  04
 Program / SubProgram:  Improvement
 Sub-Program:  Mobility
 Sub-Category:  Urban Mobility
 Improvement Type:  Rural/Urban Mobility - General Purpose
 Mile Posts: 292.16 to 299.82    
  Project Costs:
Phase From - To Prior 15-17 17-19 19-21 21-23 23-2525-27 Future Total
Preliminary Engineering Aug-04 - Jun-17 4,131,000718,0000000004,849,000
Right of Way May-07 - Jun-17 1,077,0002,094,0000000003,171,000
  Project Totals:  5,208,000 2,812,000 0 0 0 00 0 8,020,000