TEIS Home TEIS
Home
US 12/Tieton River E Crossing - Replace Bridge
Existing bridge does not meet current standards. A new bridge will be constructed in order to meet current standards and maintain safe operation of the highway.
 PIN#:  501211P   Project Page
 DOT Region:  South Central
 Counties:  Yakima
 State Route:  012
 Location:  West of Naches   Locate Project
 Leg Districts:  14
 Program / SubProgram:  Preservation
 Sub-Program:  Structures Preservation
 Sub-Category:  Structures Preservation
 Improvement Type:  Bridge Replacement (Structural)
 Mile Posts: 177.13 to 177.16    
  Project Costs:
Phase From - To Prior 15-17 17-19 19-21 21-23 23-2525-27 Future Total
Preliminary Engineering Apr-01 - Jun-09 1,114,00000000001,114,000
Right of Way Oct-07 - Jun-16 43,0002,00000000045,000
Construction Jun-09 - Jun-11 3,874,00000000003,874,000
  Project Totals:  5,031,000 2,000 0 0 0 00 0 5,033,000