TEIS Home TEIS
Home
SR 105/Smith Creek Br - Replace Bridge
Current bridge is a timber bridge supported by deteriorating timber piling. Current bridge can't carry the weight of larger, heavier trucks due to deterioration of the bridge support piling. Replacing existing bridge with one that can support the weight of the heavier trucks so they don't have to take a longer alternative route.
 PIN#:  410510A   Project Page
 DOT Region:  Southwest
 Counties:  Pacific
 State Route:  105
 Location:  West of Raymond   Locate Project
 Leg Districts:  19
 Program / SubProgram:  Preservation
 Sub-Program:  Structures Preservation
 Sub-Category:  Structures Preservation
 Improvement Type:  Bridge Replacement (Structural)
 Mile Posts: 6.25 to 10.25    
  Project Costs:
Phase From - To Prior 15-17 17-19 19-21 21-23 23-2525-27 Future Total
Preliminary Engineering Jun-06 - Jul-12 870,0000000000870,000
Construction Jul-12 - May-16 8,618,000337,0000000008,955,000
  Project Totals:  9,488,000 337,000 0 0 0 00 0 9,825,000