I-5/I-205 Bi-State Corridor Travel Time - Add Signing
This is a joint project between WSDOT and ODOT that will provide signing with destination travel times within the I-5 and I-205 corridors between the northerly and southerly I-5 and I-205 merge and diverge points in both states. This project includes the installation of ITS devices on I-5, I-205, and SR 14 in Clark County only.
 PIN#:  400515Q
 DOT Region:  Southwest
 Counties:  Clark
 State Route:  005
 Location:  Clark Co.   Locate Project
 Leg Districts:  17, 49
 Program / SubProgram:  
 Sub-Program:  
 Sub-Category:  
 Improvement Type:  Traveler Information
 Mile Posts: 0 to 0.01    
  Project Costs:
Phase From - To Prior 15-17 17-19 19-21 21-23 23-2525-27 Future Total
Preliminary Engineering Aug-13 - Sep-14 96,000000000096,000
Construction Aug-14 - Jun-15 855,0003,000000000858,000
  Project Totals:  951,000 3,000 0 0 0 00 0 954,000