SR 302/Elgin Clifton Rd to SR 16 - Corridor Study
An environmental document is required for this future project that addresses mobility and safety concerns on SR 302 between Elgin-Clifton Road and SR 16. The environmental document will examine the benefits and impacts expected to result from constructing and operating reasonable project alternatives, and will serve as the basis for selecting the preferred alternative. The process used to develop the environmental document will use an approach consistent with the National Environmental Policy Act. A defensible screening process will be used to determine the range of reasonable alternatives for study.
 PIN#:  330216A
 DOT Region:  Olympic
 Counties:  Pierce
 State Route:  302
 Location:  Pierce County   Locate Project
 Leg Districts:  26
 Program / SubProgram:  Improvement
 Sub-Program:  Mobility
 Sub-Category:  Urban Mobility
 Improvement Type:  Mobility Study
 Mile Posts: 10.6 to 16.72    
  Project Costs:
Phase From - To Prior 15-17 17-19 19-21 21-23 23-2525-27 Future Total
Preliminary Engineering Jul-07 - Jun-16 2,455,0002,0000000002,457,000
  Project Totals:  2,455,000 2,000 0 0 0 00 0 2,457,000