SR 109/Moclips River Bridge - Replace Bridge
The existing bridge design which includes 54 wooden piling, traps debris and requires repetitive channel clearing of logs and other types of debris. This project will replace the existing structure eliminating the need for continual maintenance and the associated environmental impacts.
 PIN#:  310918A   Project Page
 DOT Region:  Olympic
 Counties:  Grays Harbor
 State Route:  109
 Location:  Moclips   Locate Project
 Leg Districts:  24
 Program / SubProgram:  Improvement
 Sub-Program:  Environmental Retrofit
 Sub-Category:  
 Improvement Type:  Chronic Environmental Deficiency
 Mile Posts: 31.41 to 31.61    
  Project Costs:
Phase From - To Prior 15-17 17-19 19-21 21-23 23-2525-27 Future Total
Preliminary Engineering May-06 - Mar-27 730,0000000000730,000
Right of Way Sep-08 - Dec-26 28,000000000406,000434,000
Construction Feb-27 - Jun-27 00000004,906,0004,906,000
  Project Totals:  758,000 0 0 0 0 00 5,312,000 6,070,000