SR 522/Snohomish River Bridge to US 2 - Add Lanes
This section of SR 522 experiences severe congestion and operational problems due to high traffic volumes. This project will improve the safety and capacity of the existing two-lane roadway by constructing two additional lanes on a separate alignment to form a four-lane divided highway from the Snohomish River Bridge to US 2 in the city of Monroe. Bridges will be constructed at High Bridge Road, Snohomish River, 164th Street, 154th Street, and US 2. The traffic signal at the US 2 westbound ramp will be modified and a roundabout will be constructed at the 164th Street westbound ramp. Right of Way will be purchased for roadway, detention pond, and wetland mitigation construction. The project also includes retaining wall, guardrail, storm sewer, fish passage, wildlife crossing, landscaping, signing, illumination, Intelligent Transportation System and paving work.
 PIN#:  152234E   Project Page
 DOT Region:  Northwest
 Counties:  Snohomish
 State Route:  522
 Location:  Monroe Vicinity   Locate Project
 Leg Districts:  01, 39
 Program / SubProgram:  Improvement
 Sub-Program:  Mobility
 Sub-Category:  Rural Mobility
 Improvement Type:  Rural/Urban Mobility - General Purpose
 Mile Posts: 20.23 to 24.68    
  Project Costs:
Phase From - To Prior 15-17 17-19 19-21 21-23 23-2525-27 Future Total
Preliminary Engineering Jul-03 - Jun-13 19,420,00069,00000000019,489,000
Right of Way Jan-08 - Apr-10 3,746,00060,0000000003,806,000
Construction Jun-10 - Jun-21 112,801,0009,506,00029,00000000122,336,000
  Project Totals:  135,967,000 9,635,000 29,000 0 0 00 0 145,631,000