TEIS Home TEIS
Home
SR 99/SR 525 Interchange Vic to Lincoln Way Vic - Paving
This project will mill and fill sections of SR 99 and SR 99/SR 525 Interchange ramps with 0.15ft Hot Mix Asphalt (HMA). Required safety work includes replace all damaged traffic loops with new loops, and other minor safety work will also be performed as needed.
 PIN#:  109970N   Project Page
 DOT Region:  Northwest
 Counties:  Snohomish
 State Route:  099
 Location:  North Lynnwood   Locate Project
 Leg Districts:  21
 Program / SubProgram:  Preservation
 Sub-Program:  Roadway Preservation
 Sub-Category:  Paving
 Improvement Type:  Hot Mix Asphalt (aka ACP)
 Mile Posts: 50.46 to 51.02    
  Project Costs:
Phase From - To Prior 15-17 17-19 19-21 21-23 23-2525-27 Future Total
Preliminary Engineering Jan-15 - May-16 38,000204,000000000242,000
Construction Apr-16 - Apr-17 02,189,0000000002,189,000
  Project Totals:  38,000 2,393,000 0 0 0 00 0 2,431,000