SR 18/SR 99 Vic to Auburn Black Diamond Rd I/C - Paving
This project will mill and fill SR 18 from MP 2.20B to MP 2.37B and from MP 2.49B to MP 0.77, Weyerhaeuser Way EB Off-Ramp, C Street EB On and Off-Ramp, and Auburn-Black Diamond Rd at MP 6.41. Pavement repair will be made on SR 18 and all On-Ramps and Off-Ramps at the Auburn- Black Diamond I/C. Safety Improvements will also be included.
 PIN#:  101800D
 DOT Region:  Northwest
 Counties:  King
 State Route:  018
 Location:  Federal Way/Auburn   Locate Project
 Leg Districts:  30, 31, 47
 Program / SubProgram:  Preservation
 Sub-Program:  Roadway Preservation
 Sub-Category:  Paving
 Improvement Type:  Hot Mix Asphalt (aka ACP)
 Mile Posts: 2.2 to 6.41    
  Project Costs:
Phase From - To Prior 15-17 17-19 19-21 21-23 23-2525-27 Future Total
Preliminary Engineering Sep-09 - Sep-11 710,0000000000710,000
Construction May-11 - Mar-16 3,095,0008,0000000003,103,000
  Project Totals:  3,805,000 8,000 0 0 0 00 0 3,813,000