I-5/Smokey Point NB/SB Safety Rest Area - RV Sewage System Rehab
This project will update the existing means of handling solid waste from the RV Dump Stations. Currently, a 6,000 gallon septic tank is pumped 4 times per year which results in unneccessary maintenance and operations impacts. WSDOT will send all RV waste to the local municipal sewer treatement plant which is intended to reduce annual RV dump station costs and improve odor issues associated with the sewer system.
 PIN#:  100555B
 DOT Region:  
 Counties:  Snohomish
 State Route:  005
 Location:  Arlington   Locate Project
 Leg Districts:  10
 Program / SubProgram:  Preservation
 Sub-Program:  Other Facilities
 Sub-Category:  Rest Area Preservation
 Improvement Type:  Rest Area - RV Dump (Major Work / Capitalize)
 Mile Posts: 207 to 207.4    
  Project Costs:
Phase From - To Prior 15-17 17-19 19-21 21-23 23-2525-27 Future Total
Preliminary Engineering Dec-11 - Feb-22 17,000000000017,000
Construction Sep-22 - Jan-23 0000110,000000110,000
  Project Totals:  17,000 0 0 0 110,000 00 0 127,000