I-5/SB SR 531 I/C Vic to SR 531 SB On Ramp - Paving
This project will mill on I-5 mainline and inlay with 0.15' HMA, between MP 205.27 to MP 206.67 in the southboud direction.
 PIN#:  100553Y   Project Page
 DOT Region:  Northwest
 Counties:  Snohomish
 State Route:  005
 Location:  Smokey Point   Locate Project
 Leg Districts:  38, 39
 Program / SubProgram:  Preservation
 Sub-Program:  Roadway Preservation
 Sub-Category:  Paving
 Improvement Type:  Hot Mix Asphalt (aka ACP)
 Mile Posts: 205.27 to 206.67    
  Project Costs:
Phase From - To Prior 15-17 17-19 19-21 21-23 23-2525-27 Future Total
Preliminary Engineering Jun-16 - Dec-16 0117,000000000117,000
Construction Jan-17 - Apr-18 0424,000752,000000001,176,000
  Project Totals:  0 541,000 752,000 0 0 00 0 1,293,000