I-5 SB 88th St Off Ramp Vicinity to SR 531 SB On Ramp Vicinity - Paving
This project will mill and fill the roadway and ramps on this section of I-5 with HMA from MP 198.87 to MP 205.27, including bridges 5/651W and 5/658W. Required safety work will include installing shoulder rumble strip as applicable, striping, and other minor safety items as needed.
 PIN#:  100551B   Project Page
 DOT Region:  Northwest
 Counties:  Snohomish
 State Route:  005
 Location:  Marysville   Locate Project
 Leg Districts:  38
 Program / SubProgram:  Preservation
 Sub-Program:  Roadway Preservation
 Sub-Category:  Paving
 Improvement Type:  Hot Mix Asphalt (aka ACP)
 Mile Posts: 198.87 to 205.27    
  Project Costs:
Phase From - To Prior 15-17 17-19 19-21 21-23 23-2525-27 Future Total
Preliminary Engineering Nov-14 - Dec-16 143,000150,000000000293,000
Construction Jan-17 - Apr-18 01,558,0002,762,000000004,320,000
  Project Totals:  143,000 1,708,000 2,762,000 0 0 00 0 4,613,000