Rte Leg Dist Project# Title 19-21 21-23 23-25 25-27 27-29 Future Proj Total
000 000005QReserve funding for Traffic Operations Capital Projects 6,321,00010,300,00010,300,00010,300,0000041,044,000
000 000015RDept of Revenue - Sales Tax on Projects on Federal/Tribal land 00000099,000
000 095901XSet Aside for Improvement Program Support Activities - Improvements 28,963,00029,570,00030,182,00030,787,00031,389,00098,110,000379,353,000
000 099955HSeismic Bridges Program - High & Med. Risk (TPA) 00000051,387,000
000 0BI1002Pedestrian & Bicycle Improvements 0000003,474,000
000 0BI100AMobility Reappropriation for Projects Assumed to be Complete 00000014,136,000
000 0BI2010Collision Prevention 57,732,00054,954,00054,645,000000352,154,000
000 0BI2011Collision Reduction 24,743,00023,553,00023,419,000000150,927,000
000 0BI4002Noise Wall & Noise Mitigation Improvements 1,218,000887,00000004,814,000
000 0BI4003Stormwater & Mitigation Site Improvements 4,429,0008,543,0003,904,0003,000,0003,000,000035,808,000
000 0BI4004Chronic Environmental Deficiency Improvements 5,023,0002,030,00010,375,00014,394,00036,000063,255,000
000 0BI4ENVEnvironmental Mitigation Reserve - Nickel/TPA 1,680,000971,000945,00087,00016,0001,00011,997,000
000 0BP1001Chip Seal Roadways Preservation 67,502,00095,852,00018,289,000000307,101,000
000 0BP1002Asphalt Roadways Preservation 109,658,000104,481,000316,928,000324,252,000348,486,000760,934,0002,460,846,000
000 0BP1003Concrete Roadways Preservation 49,092,00067,861,00048,469,00032,290,00000515,684,000
000 0BP2001Bridge Replacement Preservation 3,259,00053,776,00043,756,00036,939,00049,772,000100,000,000378,924,000
000 0BP2002Bridge Repair Preservation 135,207,000105,290,000203,014,000173,476,000245,243,000516,378,0001,686,476,000
000 0BP2003Bridge Scour Prevention Preservation 1,419,0005,921,0005,053,0005,001,0005,001,00010,002,00042,042,000
000 0BP2004Bridge Seismic Retrofit Preservation 23,381,00014,942,00053,942,00058,261,00000193,473,000
000 0BP3001Emergency Relief Preservation 115,0000000061,482,000
000 0BP3002Unstable Slopes Preservation 4,436,0002,588,0006,797,00020,957,0006,000,00022,002,000139,694,000
000 0BP3003Major Electrical Preservation 4,013,0006,812,0005,587,000155,0000024,591,000
000 0BP3004Major Drainage Preservation 5,342,0007,183,000000023,425,000
000 0BP3005Rest Areas Preservation 1,741,0001,839,0001,728,000750,000750,0001,500,00015,995,000
000 0BP3006Weigh Stations Preservation 5,000,0005,001,0007,160,0007,730,0000034,894,000
000 0BP3007Preservation of Highway Safety Features 9,958,00019,763,00030,776,00030,000,00030,000,00090,000,000231,209,000
000 100017QI-5 & I-90 Ramp Meter Enhancements 000000340,000
000 400016TVancouver Urban ITS Device Infill 000000900,000
000 400017QClark County CMAQ VAST Projects 000000119,000
000 700000EARRA Program Management 00000055,041,000
000 700001CNew Locomotives (8) (ARRA) 00000059,875,000
000 700010CPassenger Rail Equipment Replacement - Insurance 10,000,00012,138,000000027,746,000
000 998951AWSF/Administrative Support - Allocated to W2 2,776,0005,296,0007,984,0008,832,0009,331,00016,542,00086,439,000
000 998951PNew CMAQ Grants Placeholders 43,0000000043,000
000 D311701NPDES Facilities Projects 250,000250,000250,000250,000250,000750,0002,495,000
000 F01000AStatewide - Freight Rail Investment Bank 89,0005,000,0005,000,0005,000,0005,000,00015,000,00035,865,000
000 F01001AStatewide - Emergent Freight Rail Assistance Projects 330,0007,040,0007,040,0007,040,0007,040,00012,870,00041,360,000
000 G2000055Land Mobile Radio (LMR) Upgrade 25,036,0000000037,038,000
000 G2000080Electric Vessel RFP 000000600,000
000 G2000087Electric Ferry Planning Team 495,00000000495,000
000 HSR001State Corridor Safety and Positive Train Control Compliance 500,000000001,500,000
000 HSR002Locomotive Service Equipment and Overhaul 2,500,000000004,000,000
000 HSR003Existing Passenger Rail Equipment Compatibility and Reliability 9,500,0000000010,500,000
000 HSR004Point Defiance Bypass Revenue Service 4,000,000000009,000,000
000 HSR005Operational Modifications after new Service Launch 750,000000001,000,000
000 HSR006HSR Program Closeout 000000500,000
000 L1000063#3 - 144-Capacity Vessel (MV Chimacum) 000000122,257,000
000 L1000068Structurally Deficient and At Risk Bridges 23,282,0000000053,300,000
000 L1000169National Highway Freight Program 15,213,00045,400,00045,400,00045,400,00045,400,00090,800,000331,413,000
000 L1000198Preservation Activities 10,000,00010,000,00010,000,00010,000,00010,000,00030,000,00090,000,000
000 L1100071Highway System Preservation 118,712,000150,167,000151,053,000148,377,000147,492,000146,538,0001,090,962,000
000 L2000006Vessel Project Support 4,117,0003,479,0003,617,0003,763,0003,914,00012,690,00046,131,000
000 L2000109#4 - 144 capacity vessel 000000122,000,000
000 L2000110Ferry Vessel and Terminal Preservation 04,192,0004,193,0004,193,0004,193,0004,193,00021,068,000
000 L2000188Pedestrian and Bicycle Safety Grant Program 25,070,00018,380,00018,380,00018,380,00010,380,00020,760,000147,272,000
000 L2000189Safe Routes to Schools Grant Program 29,170,00019,150,00019,150,00019,150,00019,150,00038,300,000211,508,000
000 L2000290Set Aside for Preservation Litigation Funds 2,500,000000007,500,000
000 L2000300ORCA Card Next Generation 2,300,0001,200,00000003,500,000
000 L2000301Maintenance Management System 400,00000000400,000
000 L2200083ADA Visual Paging Project 0000002,167,000
000 L2220057Cascades Corridor Slide Prevention and Repair 6,602,0004,567,0004,567,0004,567,0004,567,0004,567,00035,036,000
000 T000001Transit Tier Projects Contingency/Reserve 000004,750,0004,750,000
00001750210ASnohomish Co - 240th St/SR9 Grade Crossing Improvements (2015 FRAP) 000000185,000
00001L1000195Main Street Revitalization Project 000000360,000
00001L2000270NE 132nd Street Sidewalk 415,00000000500,000
00001,02,05,11,20,22,2320190002Intercity Transit: Regional Business to Business Vanpool Program 220,000220,0000000440,000
00001,05,10,21,22,38,39000600QStatewide LED Roadway Lighting Energy Reduction Project 0000001,510,000
00001,21,38,4420190001Community Transit: Swift BRT Green Line Operating 5,000,0005,000,000000010,000,000
00001,21,44100015QSR 527 & SR 96 Adaptive Signal Control System (County lead) 000000134,000
0000220170029Pierce Transit S/SR 7 Park-and-Ride/Bus 3,875,000000004,000,000
00002,10,13,15,16,30,38000510QCVISN-CVISN-Deployment Stations along I-5, I-90, and I-82 0000003,033,000
00002,17,18,19,20,22,2420190014City of Olympia State Capitol Campus TDM 160,00000000160,000
00002,2220190013Intercity Transit: High Perf. Corridor Service Implementation - Ph 1 3,084,0001,440,00000004,524,000
0000320130109Spokane Transit, Central City Line 0000002,200,000
00003G2000005U District Gateway Bridge 400,000000008,800,000
00003L1000186Triangle Truss Bridge Deck Replacement 270,00000000300,000
00003,0420170007Spokane Transit Monroe/Regal High Performance Transit (HPT) Corridor Imp2,000,000000003,925,000
00003,0420170030Spokane Transit Spokane Falls CC Transit Station 1,934,953000002,128,000
00003,0620190010Spokane Transit Auth: Cheney HP Transit Cor. Imp. & Vehicle Acquisition 2,303,0004,027,00000006,330,000
00003,06G2000034Spokane Transit - Spokane Central City Line 11,408,0000000015,000,000
0000420170026Spokane Transit Upriver Transit Center 2,779,202000003,000,000
0000420190A19Spokane County CTR Office: Liberty Lake Shuttle 112,60067,5600000180,160
00004,05,09,22D398136NPDES Facilities Construction and Renovation 0000001,139,000
00004,07600024QEastern Region CCTV Systems - New Installs 000000200,000
00005L1000166North Bend Street Overlay 000000100,000
00005,11,33,4720190004City of Kent: Rapid Ride Facility Passenger Amenities & Access Improv. 1,235,9556,764,04500008,000,000
00005,11,34,37,41,43,4520190020City of Bellevue: Bellevue Advancement of TDM Strategies (Unfunded) 550,000500,00000001,050,000
00005,22,35D398898Existing Facilities Building Codes Compliance 0000002,063,000
00005,41L1000094Issaquah-Fall City Road 1,500,000000005,000,000
00006G2000075Eastern Washington Gateway RR - Hopper Railcars Purchase (2017 FRAP) 000000409,000
00006L1000180West Plains/Spokane International Airport Rail Development 0000002,000,000
00006L1000242Spokane Airport Transload Facility 500,00000000500,000
00006L2000179Highline Grain LLC - PCC Central WA Branch Rehab (2015 FRAP) 1,467,0001,467,0001,469,0000007,337,000
00006,07,09,12,13F01111BPalouse River and Coulee City RR - Rehabilitation 365,000550,000550,000550,000550,0001,100,00012,345,000
00006,07,09,12,13L2000191Palouse River and Coulee City RR - Rehabilitation - New Law 12,698,4826,696,0006,696,0006,696,0006,696,0005,479,00053,002,482
00007720311APort of Pend Oreille - Usk to Newport Track Rehab (2019 FRAP) 624,00000000624,000
00007G2000060Port of Pend Orielle - Usk to Newport Track Rehab (2017 FRAP) 000000572,000
00007G2000074Kettle Falls International Railway, LLC - Rail Line Rehab (2017 FRAP) 0000001,000,000
00007L1000279Colville Airport Meteorological Station 60,0000000060,000
00008721410APort of Benton - Yakima & Berry Bridges & Jadwin Ave Xing (2019 FRIB) 250,00000000250,000
00008721410BPort of Benton - Yakima & Berry Bridges & Jadwin Ave Xing (2019 FRAP) 1,560,000000001,560,000
00008G2000073Kennewick Terminal LLC- Track Rehabilitation (2017 FRAP) 000000305,000
00008L2000132Duportail Bridge 22,750,0000000038,000,000
00008,09,1620190003Ben Franklin Transit: West Pasco Multimodal Hub 3,206,721505,92500003,712,646
00008,09,1620190007Ben Franklin Transit: Duportail Multimodal Hub 1,356,5591,781,90800003,138,467
00008,09,1620190008Ben Franklin Transit: Downtown Pasco Multimodal Hub 1,551,958300,00000001,851,958
0000920170031Pullman Transit Increasing Capacity 530,00000000530,000
0000920190024City of Pullman: Peak-time Shuttles & Electric Bus (Unfunded) 967,00000000967,000
00009700401AW&I Railroad - Marshall to Oakesdale Track Rehab (2019 FRAP) 780,00000000780,000
00009G2000059Washington and Idaho Railway - Track Rehabilitation (2017 FRAP) 000000699,000
00009L1000181PV Hooper Rail Line Improvements - Rail Siding 0000001,000,000
00009L1000191PV Hooper Track Improvements 0000003,800,000
00009L2000172West Whitman Railroad Improvement Project 000000204,000
00009L2000173Connell Rail Interchange 9,000,0000000010,001,000
00009,13200004NStage 2 - NCR Basin ITS Communications and Travelers Information 000000361,000
00009,13G2000061Columbia Basin RR - Othello Line Rehabilitation (2017 FRAP) 000000600,000
00010L1000249Clinton to Ken's Corner Trail 860,00000000860,000
00010L2000272Viking Way 250,00000000500,000
00010,2120190006Island Co. Public Works: Clinton P&R-to-Ferry Terminal Connection Imp. 400,000905,00000001,305,000
00010,21944402DMV Kittitas Preservation 2,696,0005,061,00020,081,0004,600,0001,678,00013,744,00061,155,000
00010,21944402EMV Kittitas Improvement 203,00070,000294,000211,000483,000462,0002,721,000
00010,21944404DMV Cathlamet Preservation 1,741,0008,743,0003,953,0002,876,00011,474,00013,550,00053,005,000
00010,21944404EMV Cathlamet Improvement 849,00070,000329,000329,000329,000462,0003,058,000
00010,21990051AMV Suquamish Improvement 120,00000000120,000
00010,21L1000006MV Tokitae Preservation 05,799,0001,516,0001,520,0003,260,00015,478,00028,917,000
00010,21L1000008MV Tokitae Improvement 245,0000255,000300,000300,000461,0001,725,000
00010,21L2000329#1 New Vessel - 144 Hybrid Electric 99,000,00089,000,0000000188,000,000
00010,21,23,26,34,40,43998521ARFP Development and Installation of a One Account-Based Ticketing System000000401,000
00010,21,23,26,34,40,43998521BLife Extension of Electronic Fare System (EFS) 0000001,166,000
00010,21,23,26,34,40,43998602AWSF/IT Terminal Telecommunications 500,00000000500,000
00010,21,23,26,34,40,43998603AWSF/Systemwide - Ladder Safety 260,00000000260,000
00010,21,23,26,34,40,43998604AWSF/IT EFS Preservation 450,00000000450,000
00010,21,26,43998951FSecurity System Upgrades Placeholder for W2 0000005,190,000
00010,24944476BMV Chetzemoka Improvement 255,00069,000329,000329,000329,000460,0003,286,000
00010,39,4020190012Skagit Transit: Commuter Bus Purchase 1,625,000000001,625,000
0001120130100City of Tukwila, Urban Center Pedestrian Bridge 0000006,870,000
00011L2000181South Lander Street 1,865,000000007,000,000
00011L2000243SW 27th/Strander Blvd Connection Phase 3 000000500,000
00011,33,34G2000031King County Metro - RapidRide Expansion, Burien-Delridge 2,257,0004,243,00000008,000,000
00011,33,4720190005City of Tukwila: South King County Regional TDM for Centers & Corridors 160,00000000160,000
00011,37P02001ACascades Train Sets - Overhaul 0000009,002,000
00011,4720170008King County Metro Renton to Auburn Transit Speed, Reliability & Service 3,496,0001,269,00000008,193,000
0001220170021Link Park and Ride 0000003,222,000
00012L1000187Woodin Ave Bridge 000000280,000
00012L2000079Euclid Ave Administration Facility Consolidation Project 00000012,000,000
00012L2000247Goodwin Bridge/ West Cashmere. 448,000000002,000,000
00012,13700602AWashington Eastern - Track Rehab - MP 11-24, 37-57 (2019 FRAP) 812,00000000812,000
0001320170016Grant Transit Moses Lake - Ellensburg Express to CWU 203,45000000373,100
0001320170018Grant Transit Moses Lake - Wenatchee Connector to WVC 170,43000000314,340
00013741110AColumbia Basin Railroad - Wheeler to Moses Lake Rehab (2019 FRAP) 728,00000000728,000
00013741411AColumbia Basin RR - Schrag Rail & Tie Replacement Phase II (2015 FRAP) 000000188,000
00013L1000235Port of Moses Lake Northern Columbia Basin Railroad Feasibility Study 250,00000000250,000
00013L1100080Port of Moses Lake 14,500,0000000020,900,000
00013L1100083Port of Warden Rail Infrastructure Expansion 0000002,001,000
00013L2000284Port of Moses Lake - Hangar Expansion 000000100,000
00013L2000285Odessa - County Road Bridge Replacement 000000100,000
0001420170023Yakima Transit Application for 20 Transit Shelters 000000152,000
0001420170027Klickitat County Mt. Adams Express 320,00000000800,000
0001420170028Skamania County Seasonal Weekend Transit to alleviate congestion/safety 00000070,000
00014G2000007Yakima Greenway Bike Trail 0000002,000,000
00014G2000010Cowiche Canyon Trail 1,800,000000002,000,000
00014L2000248Bingen Walnut Creek Railroad Crossing 000000130,000
00014L2000249Butler Road Railroad Crossing 000000207,000
00014L2000277White Salmon- Courtney Road 1,500,000000001,500,000
00014L2000328Bingen Walnut Creek & Maple Railroad Crossing 1,100,000000001,100,000
00014L200034172nd/Washington Improvements in Yakima 1,000,000000001,000,000
00014L200034248th/Washington Improvements in Yakima 650,00000000650,000
00014,15G2000058Yakima Central Railway - Install New Siding (2017 FRAP) 000000405,000
0001520190A27City of Zillah: Teapot Dome Park & Ride Construction 664,00000000664,000
00015757111ACentral Washington RR - Sunnyside to Granger Track Rehab (2019 FRAP) 676,00000000676,000
00015L2000067East-West Corridor Overpass and Bridge 05,799,00026,989,00017,256,0000050,044,000
00015L2000250E Nob Hill Blvd 000000190,000
00015,16G2000071Central Washington Railroad - Track Rehabilitation (2017 FRAP) 000000700,000
00016700410BPalouse Grain Growers - Palouse Rail Loadout Improvements (2015 FRAP) 0000006,000
00016720201AColumbia Walla Walla Railroad - Aggregate Hopper Cars (2019 FRAP) 312,00000000312,000
00016G2000057Tidewater - Improve and Expand Existing Siding (2017 FRAP) 0000001,612,000
00016L2000066Lewis Street Bridge 24,600,0000000026,000,000
00016L2000112Palouse Rail Loadout Improvements 000000301,000
00017,18,4920190015Clark County PTBA - C-TRAN: Southbound I-5 Bus on Shoulder 4,900,000000004,900,000
00017,18,4920190021Clark County PTBA - C-TRAN: Mill Plain Bus Rapid Transit (Unfunded) 3,000,00010,600,000000013,600,000
00017,18,4920190022Clark County PTBA - C-TRAN: Columbia House P&R Expansion (Unfunded) 2,451,000000002,451,000
00017,18,49400017FSWR Legacy Fiber Upgrade 00000054,000
00017,18,49G2000047C-TRAN - Vancouver Mall Transit Center Relocation and Upgrade 0001,000,0001,600,000600,0003,200,000
00017,49400017RSWR Ramp Meter Study 2016 - Vancouver Metro Area 00000089,000
00017,49400019QCentralized Signal System Enhancements 369,00000000452,000
00017,49400019RI-5/I-205 Urban Ramp Meter - Phase 1 000000509,000
00017,49400019VRegional Video Sharing 000000150,000
0001820170012C-TRAN Diesel/Electric Hybrid Vehicle Purchase 0000005,812,993
00018725910ARidgefield Rail Overpass 606,000000001,515,000
00018G2000056Clark County Chelatchie Prairie RR (2017 FRAP) 000000400,000
00018L1000167Bridge 12 (Salmon Creek) Replacement 0000002,800,000
00018L1000172Chelatchie Prairie Railroad - Railroad Tunnel Emergency Repairs 000000150,000
00018L1000233Chelatchie Prairie Railroad Roadbed Rehabilitation 1,500,000000001,500,000
00018L1000285Washougal 32nd St Underpass Design & Permitting 300,00000000300,000
00018L1100049Scott Avenue Reconnection Project 300,000000002,000,000
00018L2000064Ridgefield Rail Overpass 3,950,000000007,768,000
00018L2000164Brady Road 6,000,000000006,000,000
0001920170022Wahkiakum County Health & Human Service Regional Mobility Expand Service222,00000000444,000
00019G2000072Puget Sound & Pacific Railroad-Grays Harbor At-Grade (2017 FRAP) 000000339,000
00019L1000147South Kelso Railroad Crossing 11,600,00012,500,000000025,000,000
00019L1000222Beech Street Extension 1,000,000000001,000,000
00019,2020190016City of Longview-RiverCities Transit:Lexington Connector Exp. 292,00000000292,000
00020750101ARainier Rail - Blakeslee to Chehalis Bridges (2019 FRAP) 458,00000000458,000
00020L1000202Coal Creek Drive Repairs 000000125,000
0002120170015City of Everett - Wireless Electric Bus Riverfront to Waterfront Connect0000002,880,000
0002120170017Everett, City of-80 Stall Park and Ride Expansion 500,00000000750,000
00021L1000177Edmonds Street Waterfront Connector 6,200,000000006,700,000
00021L1000252Edmonds Waterfront Connector 750,00000000750,000
00021L2000136Harbour Reach Extension 11,000,0000000015,100,000
00021,23944442BMV Spokane Preservation 8,372,0001,785,00020,515,0006,234,0002,929,0004,141,00091,800,000
00021,23944442CMV Spokane Improvement 180,00071,000330,000330,000330,000462,0004,378,000
00021,23944499CMV Puyallup Preservation 5,887,0003,410,0002,358,000361,0005,578,00067,598,00097,490,000
00021,23944499FMV Puyallup Improvement 255,00071,000330,000330,000330,000462,0004,014,000
00021,38,44G2000046Community Transit, Everett Transit - SWIFT II Bus Rapid Transit 02,103,0002,898,0002,682,5002,316,00009,999,500
0002220170001Intercity Transit Route 612 Express Service Expansion 1,049,546000002,042,866
0002220170010Intercity Transit Design and Construction - Regional Vanpool Service Ctr3,900,000000005,900,000
00022D399301Olympic Region Headquarters Facility Site Debt Service 575,000576,000573,0001,000006,128,000
00022G2000019Deschutes Valley Trail Connection 0005,800,000005,800,000
00022L1000089Mottman Rd Pedestrian & Street Improvements 001,110,0006,498,000007,608,000
00022L1000151Olympic Region Maintenance and Administration Facility 42,497,0000000058,539,000
00022,25,28,31300044QRegion Wide HAR Improvements and Fiber Expansion 000000764,000
0002320130101Kitsap Transit, SR 305 Interchange Improvements at Suquamish Way Park an0000002,326,000
00023,25G2000039Kitsap Transit - East Bremerton Transfer Center 3,000,000000003,000,000
00023,26L1100038LNG Security Planning and Outreach 000000471,000
00023,35G2000044Kitsap Transit - Silverdale Transfer Center 00002,300,00002,300,000
00023,43944499DMV Tacoma Preservation 13,892,000712,00066,0004,371,00067,063,00017,567,000137,585,000
00023,43944499GMV Tacoma Improvement 350,00071,000329,000329,000329,000462,0004,298,000
00023,43G2000084Electric Ferry - Conversion 41,500,0000000041,500,000
00024744210APuget Sound & Pacific Railroad - Hoquiam Bridge (2019 FRAP) 874,00000000874,000
00024L1000146Grays Harbor Rail Corridor Safety Study 000000300,000
00024L10001948th Street Bridges - Protective Barriers 000000350,000
00025L1000196Interurban Trail & Trailhead Relocation 1,200,000000001,200,000
00025,26,27,28,29,30,3120190A23Pierce Transit: Pacific Ave/SR 7 Corridor BRT Stations 2,100,0002,100,00000004,200,000
00025,27,29G2000045Pierce Transit - SR 7 Express Service Tacoma to Parkland/Spanaway 3,700,0009,800,000000015,000,000
00026L2000251Tremont Street Widening/Port Orchard 0000002,000,000
00026,34944401DMV Issaquah Preservation 2,221,0001,912,0004,866,0001,785,0006,514,00029,931,00059,907,000
00026,34944401EMV Issaquah Improvement 203,00070,000329,000329,000329,000462,0002,671,000
00026,34944412CMV Klahowya Preservation 0000006,276,000
00026,34944413BMV Tillikum Preservation 0000005,476,000
00026,34944413CMV Tillikum Improvement 070,000329,000329,000329,000462,0002,315,000
00026,40,43944471AMV Chetzemoka Preservation 731,0001,792,00082,0004,882,0003,502,00033,199,00045,895,000
00026,40,43999910KEmergency Repair 5,000,0005,000,0005,000,0005,000,0005,000,00010,000,00058,870,000
00026,43944403DMV Kitsap Preservation 266,0002,662,00010,698,0003,038,0003,653,0009,358,00045,602,000
00026,43944403EMV Kitsap Improvement 830,00070,000329,000329,000329,000462,0003,354,000
00026,43944431DMV Hyak Preservation 00000019,924,000
00026,43944431EMV Hyak Improvement 0000001,111,000
00026,43944441BMV Walla Walla Preservation 495,00010,778,00010,531,0005,505,0002,583,0004,885,00072,133,000
00026,43944441CMV Walla Walla Improvement 180,00071,000330,000330,000330,000462,0004,148,000
00026,43944499EMV Wenatchee Preservation 15,439,0006,141,000994,0003,886,00010,242,00072,390,000122,052,000
00026,43944499HMV Wenatchee Improvement 353,00071,000330,000330,000330,000462,0003,762,000
00027726811ATacoma Rail - Tote Yard Improvement (2019 FRIB) 400,00000000400,000
00027726813ATacoma Rail - Marine View Drive Track Rehab (2019 FRAP) 1,144,000000001,144,000
00027726821ATacoma Rail - Mazda Siding Upgrade (2019 FRIB) 240,00000000240,000
00027G2000012Schuster Parkway Trail 02,000,0002,000,0000004,000,000
00027L1000132SR 163/N 46th St. to N 54th St. 0000002,500,000
00028G2000004Gravelly Lake Non-Motorized Trail 0000002,640,000
00028G200000854th Street Project 000000745,000
00028G2000009Cirque Drive - Sunset to 83rd 000000380,000
00028G2000015Bay Street Pedestrian Project 2,955,000000003,500,000
00028G2000021Lake City Business District Sidewalks 2,000,000000002,000,000
00028L1000224Dupont-Steilacoom Road Improvements 3,900,000000003,900,000
00028L2000289Rail Crossing Improvements at 6th Ave. and South 19th St. 1,110,000000001,150,000
00028,29L1000144Point Defiance Rail Bypass - Lakewood Safety 0000001,885,000
00030G2000014Steel Lake Park to Downtown Trail 000000300,000
00030G2000017Milton Trail Head/Interurban Trail 000000405,000
00030G2000018City of Pacific - Interurban Trail 45,000000001,850,000
00031L2000218Jovita Seismic Wall 0000001,000,000
00031,33,4201F035AS 228th Street Extension & Grade Separation 0000008,623,000
00032100010TNorthwest Region TMC Improvements 00000013,523,000
00032888899MDayton Ave RHQ - Purchase Furniture 1,565,000000001,565,000
00032L2000287Northwest Region Headquarters Renovation 43,100,0000000046,500,000
00033L2000133228th & Union Pacific Grade Separation (City of Kent) 6,000,0000000015,000,000
00033L200020028th/24th Street Sea-Tac 0000002,000,000
00033L2000241South 116th Street Peter Western Bridge Repairs 230,00000000500,000
00034L2000239Bus Lane Signage Vashon Ferry Terminal 00000075,000
00034L20002404th Ave SW Enhancement Project 000000620,000
00034,36,37,4320190011City of Burien: Ambaum Blvd and H Line Transit Pathway Improvements 10,000,0000000010,000,000
00034,3720170025Seattle, City of - Delridge to Burien RapidRide Line 5,000,0000000010,000,000
0003520170009Kitsap Transit Silverdale Transit Center 1,700,000000007,000,000
0003520170014Kitsap Transit Wheaton Way Transit Center 2,000,000000006,000,000
00035G2000042Mason Transit - Park and Ride Development 633,0003,085,00000004,585,000
00035L1000260Wallace Kneeland and Shelton Springs Road intersection improvements 650,00000000650,000
00035L2000275Shelton - Downtown Connector Project 0000001,000,000
00036G2000023Seattle Waterfront Loop Feasibility Study 00425,00075,00000500,000
00036,43G2000032King County Metro - Route 40 Northgate to Downtown 1,000,0002,000,00000003,000,000
00036,43G2000033King County Metro - Route 43 & Route 44 - Ballard to University District03,000,00000003,000,000
00036,43G2000038King County Metro - 67th to Fremont Transit Corridor 00900,0002,100,000003,000,000
00036,43G2000043King County Metro - Route 48 North University Link Station to Loyal Heig001,000,0002,000,000003,000,000
00036,43,4620190009Seattle DOT: Market/45th RapidRide 4,000,0002,000,00000006,000,000
0003720170024King County Metro Transit Speed & Reliability Hot Spot Imp Program 1,400,000000002,000,000
00037G2000040City of Seattle - MLK Way/Rainier Ave S I/C Improvements 00900,000000900,000
00037L2000237Renton Avenue Pedestrian Safety 590,00000000590,000
00037,4320190018Seattle DOT: RapidRide Roosevelt (Unfunded) 2,000,0004,000,00000006,000,000
00037,43G2000037City of Seattle - Trolley Expansion/Electrification, Madison Route 02,544,5003,433,5000008,000,000
0003820170006Community Transit Swift Green Line Bus Rapid Transit - 60 ft Expansion B0000007,000,000
00038722814APort of Everett - South Terminal Modernization Project ( 2019 FRIB) 6,157,000000006,157,000
00038G2000029Everett Transit - North Broadway Bus Stop Safety Improvements 0000003,000,000
00038G2000064Port of Everett (2017 FRIB) 0000005,000,000
00038L200013441st Street Rucker Avenue Freight Corridor Phase 2 02,492,00010,000,00024,008,0000036,500,000
00038L2000242Centennial Trail Connector -Phase 3 300,00000000500,000
00038,4420170A32Lake Stevens, City of - US 2 Trestle HOV/Transit Trestle Congestion 1,603,360000001,822,000
0003920170002Skagit Transit Connector Services Expansion Project 639,380000001,215,584
00039L2000276Lyman - Prevedal Road Repairs 000000300,000
00040944405DMV Chelan Preservation 4,945,0005,141,0009,554,00018,108,0002,250,00018,421,00076,186,000
00040944405FMV Chelan Improvement 203,00070,000329,000329,000329,000462,0002,620,000
00040944406DMV Sealth Preservation 250,0006,894,0006,161,00013,866,0002,671,00019,388,00062,972,000
00040944406EMV Sealth Improvement 203,00070,000329,000329,000329,000462,0002,613,000
00040944432GMV Elwha Preservation 2,581,000722,000000037,572,000
00040944432HMV Elwha Improvement 83,00071,000330,000330,000330,000462,0002,275,000
00040944433DMV Kaleetan Preservation 211,0008,743,0006,213,0004,831,0001,277,000049,880,000
00040944433EMV Kaleetan Improvement 180,00071,000330,000330,000330,000462,0003,390,000
00040944434DMV Yakima Preservation 5,142,0007,669,00023,074,0005,184,0001,331,000063,937,000
00040944434EMV Yakima Improvement 232,00070,000366,000320,000302,000462,0003,112,000
00040990040WMV Chimacum Preservation 1,184,0001,447,000227,0009,432,0006,899,00022,298,00041,488,000
00040990041WMV Chimacum Improvement 255,0000254,000300,000300,000460,0001,569,000
00040G2000020Guemes Channel Trail 0000328,0003,172,0003,500,000
00040G2000025Trestle - Park & Ride - Trail 000250,00000250,000
00040G2000026Washington Park to Ferry Terminal - Trail 000150,000600,0000750,000
00040G2000030San Juan County - Orcas Village Park and Ride 000000760,000
00040L1000007MV Samish Preservation 126,0004,608,0007,784,0002,226,0001,825,00017,300,00035,102,000
00040L2200038#1 - 144-Capacity Vessel (MV Tokitae) 000000124,089,000
00040L2200039#2 - 144-Capacity Vessel (MV Samish) 000000119,291,000
00041G2000006Wilburton Reconnection Project 5,000,000000005,000,000
00041L1000189Aubrey Davis Park Master Plan 15,00000000100,000
00041WLBTRSTLWilburton Trestle 2,500,000000002,500,000
00041,4820170020King County Metro Totem Lake/Kirkland to Bellevue/Eastgate Transit Imp 500,0001,620,00000002,120,000
00041,48G2000011Mountains to Sound Greenway 8,000,0000000014,000,000
00042100098UWA-BC Joint Transportation Action Plan - Int'l Mobility & Trade Corridor200,00000000741,000
00042L1000184Emergency Road Repair Project - North 8th Street - Lynden 000000350,000
00042L1000239Grade Separation at Bell Road 1,000,000000001,000,000
00042L2000120Orchard Street Connector 9,440,0000000010,000,000
00042L2000228Thornton Road Overpass 12,167,0005,000,000000019,167,000
00042L2200089Slater Road Bridge 000000350,000
0004320130027Seattle DOT, 23rd Avenue Transit Improvements 0000004,000,000
0004320170005King County Metro Eastlake Off-Street Layover Facility 6,336,800000008,096,800
0004320170013King County Metro/Sound Transit Link Station Integration 1,456,000000002,080,000
00044L200017135th Street Mill Creek 1,000,000000005,750,000
00044L2000264South Lake Stevens Multi-Use Path 1,000,000000001,300,000
00044L200026735th Ave. SE Reconstruction Project 000000500,000
00045G2000078Redmond Ridge NE Roundabout 800,00000000800,000
0004620170003King County Metro Northgate Transit Center TOD - Access and Facility Imp4,512,063000005,241,007
00046G2000016Burke-Gilman Trail Transit Access, Safety & Efficiency Improvements 0001,700,0006,600,0007,700,00016,000,000
00046G2000041City of Seattle - Northgate Transit Center Pedestrian Bridge 6,000,0000000010,000,000
00046L2000137Sammamish Bridge Corridor 11,000,0000000012,000,000
00046,4720170004King County Metro Route 101 Service Increase: Renton to/from Seattle 1,459,664000003,086,251
00047L1000201Covington Way SE Intersection Improvements 300,00000000300,000
00047L1000270Complete 224th Phase 2 1,500,000000001,500,000
00047L2000104Covington Connector 19,160,0000000024,000,000
00048G2000013SR 520 Trail Grade Separation at 40th Street 8,119,0000000010,700,000
00048G2000024SR 520 Regional Bike Path and Trail 0000002,800,000
00048G2000028King County Metro - Bike Share Expansion - Kirkland, Bellevue, Redmond, 50,0000002,685,0002,640,0005,500,000
00048G2000048NE 52nd Street Blvd - Cross Kirkland Corridor 000372,000714,00001,086,000
00048L1000081Community Facilities District Improvements (Redmond) 1,100,000000005,000,000
00049400018QCentralized Signal System - Joint ATMS throughout Clark County 000000200,000
00049G2000088I-5/Columbia River Bridge 35,000,0000000035,000,000
00049L1100082West Vancouver Freight Access 0000001,901,000
00049L2000262Columbia River Renaissance Trail Connection 300,00000000500,000
00206600227QUS 2/Spotted Rd to I-90 - ITS 000000594,000
00210,24944477AMV Salish Preservation 761,0005,076,0002,430,000966,0004,112,00040,937,00056,769,000
00212200201JUS 2/East Wenatchee N - Access Control 000000359,000
00212200201KUS 2/Wenatchee River Bridge - Replace Bridge 0000008,604,000
00212200208QUS 2/W of Wenatchee - VMS 000000413,000
00212,39200202TUS2/Stevens Pass -- ITS Emergency Power 000000244,000
00212,39200210QUS 2/W of Stevens Pass Camera installation 000000185,000
00218L1000284Ridgefield South I-5 Access Planning 250,00000000250,000
00230L1000283South 314th St Improvements 300,00000000300,000
00239N00200RUS Hwy 2 Safety 2,600,00014,300,000000019,000,000
00244L1000158US 2 Trestle IJR 950,000000003,501,000
00320L1000282Mickelson Parkway 750,00000000750,000
00326L2000176SR 3/SR 304 Interchange Modification 0000004,200,000
00326,35300310SSR 3/SR 16 Gorst Practical Design - Planning Study 000000415,000
0033520150016Mason Transit - Regional Express Commuter Bus Service 0000001,768,946
0033520150024Mason Transit - Park and Ride Development 2,701,201000004,750,000
00335300344DSR 3/Belfair Area - Widening and Safety Improvements 8,0000000026,485,000
00335L2000254SR 3 Speed & Crosswalk Signs 00000057,000
00335T30400RSR 3 Freight Corridor 9,900,00025,410,00031,300,00000066,910,000
00336L1000281Ballard-Interbay Regional Transportation system plan 700,00000000700,000
00337L1000280I-405/North 8th Street Direct Access Ramp in Renton 00125,000,000125,000,00000250,000,000
00340L1000009MV Samish Improvement 255,0000254,000300,000300,000461,0001,869,000
00410,24944477BMV Salish Improvement 255,00069,000329,000329,000329,000460,0003,125,000
00419400411ASR 4/Abernathy Creek Br - Replace Bridge 001,600,0006,900,0001,500,000010,000,000
00419L1000175West Main Street Realignment Project - Phase II 500,000000003,000,000
00501,30,33,37,43,45,4620150003King County Metro SR 522 and I-5 operating 0000003,669,000
00502,10,13,15,16,30,38000515QExpanded CVISN-automated Infrared Roadside Screening 000000332,000
00502,22,28L1000231I-5 Corridor from Mounts Road to Tumwater 2,250,000000002,250,000
00502,22,28M00100RI-5 JBLM Corridor Improvements 165,000,000115,000,00050,000,000000494,400,000
00502,22,28,29300596TI-5/SR 510 to SR 512 - Mobility Improvements 00000022,423,000
00502,27,28,29730310ATacoma- Point Defiance Bypass (ARRA) 000000191,124,000
00511,30,33,37,43,46100516QI-5/CCTV Enhancement S 188th St to NE 80th St - Camera Installation 3,00000000450,000
00511,33100513QI-5/NB Vicinity Southcenter - VMS Replacement 000000255,000
00517,18L1000111I-5/179th St Interchange 0050,000,00000050,500,000
00518,49400506HI-5/NE 134th St Interchange (I-5/I-205) - Rebuild Interchange 00000085,698,000
00519400510AI-5/SR 432 Talley Way Interchanges - Rebuild Interchanges 00000034,913,000
00520400506MI-5/Chehalis River Flood Control 0000006,793,000
00520400508WI-5/Mellen Street I/C to Grand Mound I/C - Add Lanes 32,00000000152,966,000
00520L1000223I-5/Rush Road Interchange Improvements 1,000,000000001,000,000
00520L2000204I-5/North Lewis County Interchange 00010,000,00020,000,00020,500,00050,500,000
00520L2000205I-5/Mellen Street Connector 6,800,000000007,533,000
00520L2000223I-5/Rebuild Chamber Way Interchange Improvements 4,000,00010,020,00045,525,00000076,100,000
0052120150106WSDOT - SR 525 - Pedestrian & Traffic Improvements 1,771,620000002,271,000
00521,32100536DI-5/SR 525 Interchange Phase 0000019,367,00020,010,000
00522300519QI-5/Olympia Area Southbound - Congestion Management 550,00000000550,000
00522L1100110I-5/Marvin Road/SR 510 Interchange 19,500,0000000072,000,000
00525L1000087I-5/Port of Tacoma Road Interchange 16,200,0002,000,000000022,300,000
00525,27,29300504AI-5/Tacoma HOV Improvements (Nickel/TPA) 136,568,00089,319,00017,373,0000077,840,0001,478,546,000
0052720150013City of Tacoma - Tacoma Link Expansion Phase 1 0000005,000,000
00530100502BI-5/SR 161/SR 18 Interchange Improvements - Stage 2 0000001,902,000
00530800502KI-5/SR 161/SR 18 - Interchange Improvements 00000089,276,000
00530T20400RI-5 Federal Way - Triangle Vicinity Improvements 010,000,00030,000,00045,000,0000085,000,000
00530,46,4820150009King County Metro - Park and Ride Efficiency and Access Project 100,000000002,595,000
00532100528QI-5/SB N 145th St Vicinity - Variable Message Sign Installation 000000948,000
00537,43100521WI-5/NB Seneca St to SR 520 - Mobility Improvements 15,955,0000000021,234,000
00538100515QI-5/Northbound vicinity Marysville - Ramp Meters 506,00000000866,000
00538100555QI-5/North Everett to SR 528 - ITS 0000002,371,000
0053820150005Community Transit-Seaway Transit Center-Swift II BRT 0000006,800,000
00538L2000139I-5/156th NE Interchange in Marysville 0003,000,00013,000,00026,000,00042,000,000
00538L2000229I-5 Peak Hour Use Lanes and Interchange Improvements 44,600,00029,900,000000084,400,000
00538T20700SCI-5/116th Street and 88th Street Interchanges - Improvements 5,150,00025,000,000000049,939,000
00540,42L1000099I-5/Slater Road Interchange - Improvements 2,000,0009,000,00010,100,00000021,100,000
00542L2000119I-5/Northbound on-ramp at Bakerview 6,500,0000000010,000,000
00542L2000255I-5/Exit 274 Interchange 000000550,000
00543100522QI-5/Mercer Street NB and SB Ramp Meter Systems 000000196,000
00543800524ZI-5/Ship Canal Bridge - Noise Mitigation Study 0000004,920,000
00543L2000160I-5/Ship Canal Noise Wall 400,0003,100,00000003,500,000
00543,46100517QI-5/SB NE 45th St to NE 130th St - Ramp Meters 000000780,000
00549000516QExpanded CVISN-Replace iSINC WIM Computers 000000850,000
00549L2000099I-5/Mill Plain Boulevard 0010,400,00074,800,00012,500,000097,700,000
00549L2000259Replacement Bridge on Interstate 5 across the Columbia River 000000350,000
00619400694ASR 6/Willapa River Br - Replace Bridge 0000006,960,000
00619,20400612ASR 6/Rock Creek Br E - Replace Bridge 1,0000000010,130,000
00619,20400612BSR 6/Rock Creek Br W - Replace Bridge 0000007,261,000
00725,27,2920150014Pierce Transit - Route 1 Connections/Route 4 112th Street Peak Hour Serv0000004,642,000
00901100900FSR 9/212th St SE to 176th St SE, Stage 3 - Add Lanes 00000053,543,000
00901,44100904BSR 9/176th Street SE to SR 96 - Widening 12,348,0000000022,076,000
00901,44100914GSR 9/SR 96 to Marsh Rd - Add Lanes and Improve Intersections 00000029,534,000
00910100934RSR 9/Pilchuck Creek - Replace Bridge 00000015,611,000
00939,44100922GSR 9/84th St NE (Getchell Road) Improve Intersection 0000006,745,000
00944100916GSR 9/Lake Stevens Way to 20th St SE - Improve Intersection 00000011,803,000
00944100921GSR 9/SR 528 - Improve Intersection 000003,847,0003,847,000
00944L1000185SR 9/4th Street NE - Frontier Village Access Improvement 420,00000000420,000
00944L1000240SR 9/South Lake Stevens Road Roundabout 2,000,000000002,000,000
00944N00900RSR 9/Snohomish River Bridge Replacement 5,300,00023,800,00087,500,00025,500,00000142,100,000
00944N92040RSR 9/SR 204 Interchange 34,831,00026,000,000000069,500,000
01027944478BMV Kennewick Preservation 141,0002,245,0002,594,000156,0001,214,00046,025,00053,721,000
01214501211NUS 12/Tieton River W Crossing - Replace Bridge 0000006,015,000
01214L2000075US 12/ Wildcat Bridge Replacement 0000008,300,000
01215501208JUS 12/Old Naches Highway - Build Interchange 0000037,084,00038,439,000
01216501203XUS 12/Frenchtown Vicinity to Walla Walla - Add Lanes 00000051,652,000
01216501210TUS 12/Nine Mile Hill to Woodward Canyon Vic - Build New Highway 0000005,337,000
01216501212IUS 12/SR 124 Intersection - Build Interchange 00000021,317,000
01216T20900RUS-12/Walla Walla Corridor Improvements 118,000,00016,000,0000000168,807,000
01219L1000178Montesano Compact Roundabout 000000550,000
01227944478CMV Kennewick Improvement 180,00069,000329,000329,000329,000460,0003,384,000
01414L2000074SR 14/ Wind River Junction 4,215,000000008,252,000
01414L2220062SR 14/Bingen Underpass 17,785,0004,365,000000026,000,000
01417,18,49L2000102SR 14/I-205 to SE 164th Ave - Auxiliary Lanes 18,000,0003,000,000000025,000,000
01418401409WSR 14/Camas Washougal - Add Lanes and Build Interchange 00000048,553,000
01418L1000157SR 14 Access Improvements 4,980,000000007,500,000
01449401412QSR 14/Traveler Information Enhancements Phase II 000000375,000
01449401417QSR 14 ATIS Infill; I-5 to Evergreen 34,000000001,101,000
01626,28TNB001ASR16/ Repayment of Sales Tax for New Tacoma Narrows Bridge 0000057,593,00057,593,000
01626,28TNBPRESSR 16/Tacoma Narrows Bridge R&R - Preservation 7,906,0007,156,000481,0002,292,0001,280,0003,144,00024,043,000
01626,35L2000175SR 16/Corridor Congestion Study 0000003,000,000
01709201701GSR 17/Adams Co Line - Access Control 000000105,000
01805101822ASR 18/Issaquah/Hobart Rd to Tigergate - Add Lanes 0000003,026,000
01805101826ASR 18/Tigergate to I-90 - Add Lanes 0000003,023,000
01805L1000199SR 18 Widening - Issaquah/Hobart Rd to Raging River 8,900,00018,000,000000027,000,000
01830,31,47L1000120SR 18 Eastbound Off-Ramp 11,840,0000000015,000,000
01847101812QSR 18/WB Ramps & SE 304th Street Intersection 00000061,000
02007202000WSR20/Wauconda Summit - RWIS and Camera 000000295,000
02010902017KCoupeville (Keystone) Tml Preservation 005,713,0001,187,0002,611,0007,681,00020,107,000
02010902017MCoupeville (Keystone) Tml Improvement 161,000000001,652,000
02010L2000169SR 20/Oak Harbor to Swantown Roundabout 00006,000,00024,000,00030,000,000
02010L2200040Parker Road - SR 20 Realign and Transit Park 000000896,000
02010L2200042SR 20 Race Road to Jacob's Road 24,0009,00012,0003,000003,678,000
02010,40102020QSR 20/Oak Harbor and SR 20 Spur to Pulver Rd - Signal Integration 000000501,000
02024900012KPort Townsend Tml Preservation 001,754,0003,309,00013,685,000234,00032,913,000
02024900012LPort Townsend Tml Improvement 0000002,193,000
02040900022ILopez Tml Preservation 406,0003,554,0005,283,000001,645,00019,380,000
02040900022JLopez Tml Improvement 0000001,161,000
02040900024FShaw Tml Preservation 2,00002,945,0001,751,00001,219,0008,368,000
02040900024GShaw Tml Improvement 00000034,000
02040900026POrcas Tml Preservation 275,0001,696,0001,850,000976,0003,477,0006,611,00021,045,000
02040900026QOrcas Tml Improvement 75,000627,00000002,211,000
02040900028UFriday Harbor Tml Preservation 243,0001,355,000430,0001,240,00005,838,00010,395,000
02040900028VFriday Harbor Tml Improvement 000000957,000
02040902020CAnacortes Tml Preservation 2,386,0003,546,00017,154,00017,078,00016,158,00020,317,00086,150,000
02040902020DAnacortes Tml Improvement 110,0000000024,362,000
02040L1000112SR 20/Sharpes Corner Vicinity Intersection 00000013,400,000
02409202400QNCR Basin ITS Phase 3 000000424,000
02415502402ESR 24/I-82 to Keys Rd - Add Lanes 00000050,524,000
02609L2000057SR 26/Dusty to Colfax - Add Climbing Lanes 11,150,0000000011,150,000
02609L2000236SR 26 & US 195 Safety Improvements 000000416,000
02812202800DSR 28/Jct US 2 and US 97 to 9th St, Stage 1 - New Alignment 00000040,075,000
02812202801JSR 28/E Wenatchee - Access Control 2,200,000000003,041,000
02812202802VSR 28/E End of the George Sellar Bridge - Construct Bypass 00000028,273,000
02812T10300RSR 28 East Wenatchee Corridor Improvements 4,050,00018,700,00015,500,00020,000,0000058,500,000
02812,13202802JSR 28/Wenatchee to I-90 - Study 000000102,000
08208,16508208MI-82/Red Mountain Vicinity - Pre-Design Analysis 557,000000002,962,000
08214,15T21100RI-82 Yakima - Union Gap Economic Development Improvements 04,531,00044,776,00015,106,0000064,413,000
08215508201OI-82/Valley Mall Blvd - Rebuild Interchange 00000034,803,000
08215508201SI-82/South Union Gap I/C - Improvements 0000003,219,000
08215508208OI-82/US 12 Interchange to Yakima Ave - Add lanes and Replace Bridges 235,000000002,003,000
08215L2000123I-82/ EB WB On and Off Ramps 17,300,0000000034,400,000
08216T10400OI-82 West Richland - Red Mountain Interchange 4,603,00018,945,000000028,400,000
09003,04,06609006QSpokane Area Traffic Volume Collection 000000151,000
09003,04,06609007QSpokane Area Traffic Volume Collection 000000600,000
09003,04,06609047QI-90/Freeway/Arterial Integrated Corridor Management 2019 - 2021 550,00000000550,000
09004609049BI-90/Spokane to Idaho State Line - Corridor Design 0000008,023,000
09004L2000122I-90/Barker to Harvard - Improve Interchanges & Local Roads 20,750,0002,900,000000026,900,000
09005109062QI-90/Highpoint to SR 18 - Fiber Extension 840,00000000840,000
09005509019QI-90/SR 18 Interchange Vic EB - Install VMS 400,00000000400,000
09005L1000113I-90/SR 18 Interchange Improvements 73,100,00071,900,0000000150,000,000
09005L2000124I-90/Front Street IJR 0000002,300,000
09005,11,34,36,37,41,4320150010King County Metro - I-90 Manage Demand 0000002,880,000
09005,13509009BI-90/Snoqualmie Pass East - Hyak to Keechelus Dam - Corridor Improvement4,877,0001,743,000523,000523,000523,000523,000564,921,000
09005,41,48L2000201I-90/Eastgate to SR 900 - Corridor Improvements 61,675,0000000073,200,000
09006L2000094I-90/Medical Lake & Geiger Interchanges 18,500,000100,000000026,600,000
09006,07,0920150019Spokane Transit Authority - West Plains Transit Center 1,000,000000007,049,841
09007,13609004QI-90/Sprague Rest Area Traveler Information 000000133,000
09013509016OI-90/Canyon Rd Interchange - EB Ramp Terminal Improvements 305,00000000703,000
09013509091QI-90/Ellensburg Vicinity - Install VMS and Traffic Cameras 000000529,000
09013M00500RI-90 Snoqualmie Pass - Widen to Easton 36,500,00099,700,000182,000,00097,000,00000426,400,000
09041109025QI-90/EB E Mercer Way - ITS 200,00000000200,000
09712209703HUS 97/North of Brewster - Passing Lane 0000001,459,000
09712L2000274Chelan - Traffic Improvements 200,00000000300,000
09713L2000163Dolarway Intersection Improvements 0000003,919,000
09714,15409716QUS 97/Centerville Rd to Yakima Co - Variable Message Signs 000000481,000
09911,32,36,37,43,46809940BSR 99/Viaduct Project - Construction Mitigation 3,000,0000000038,170,000
09911,36,37,43809936ZSR 99/Alaskan Way Viaduct - Replacement 180,647,000000003,325,774,000
09911,36,37,43L1000034Alaskan Way Viaduct - Automatic Shutdown 0000004,117,000
09921NEDMONDSR 99 Revitalization in Edmonds 300,0009,000,000000010,000,000
09925,27,30L1000176SR 99/I-5 Interchange - Fife 000000500,000
09936L2000338SR 99 Aurora Bridge ITS 700,00000000700,000
09936,37,43L2000291SR 99 Tunnel R&R - Preservation 10,00010,00010,00010,0005,780,00034,870,00040,690,000
09936,43109947BSR 99/Aurora Bridge - Painting 13,839,0000000046,795,000
09940L1000092SR 99/Burlington N Overpass Replacement 0000002,000,000
10124310101FUS 101/Dawley Rd Vic to Blyn Highway - Add Climbing Lane 000002,276,0003,218,000
10124310102FUS 101/Gardiner Vicinity - Add Climbing Lane 000002,175,0002,560,000
10124310107BUS 101/Shore Rd to Kitchen Rd - Widening 00000051,059,000
10124L1000247US 101/Morse Creek Safety Barrier 1,000,000000001,000,000
10124L2000279US 101/Lower Hoh Road Intersection Improvements 506,00000000600,000
10124L2000343US 101/East Sequim Corridor Improvements 1,290,000000001,290,000
10135310116DUS 101/Lynch Road - Safety Improvements 0000001,005,000
10135L2000161US 101/Lynch Road Intersection Improvements 0000005,000,000
10421910413QEdmonds Tml Preservation 355,00005,875,00012,137,00042,036,000061,594,000
10421910413REdmonds Tml Improvement 494,000149,00000026,000,00042,800,000
10423910414PKingston Tml Preservation 1,921,0002,382,00013,400,00012,575,000016,533,00052,588,000
10423910414SKingston Tml Improvement 000000178,000
10423L2000246SR 104 Realignment for Ferry Traffic 000000500,000
10424310407DSR104/Port Angeles Graving Dock Settlement and Remediation 0000006,095,000
10446L1000244SR 104/ 40th Place NE Roundabout 650,00000000650,000
10446L2000245Lake Forest Park SR 104/Lyon Creek Culvert 270,00000000540,000
10512L2200092SR 150/No-See-Um Road Intersection - Realignment 0000008,493,000
10719L2000116SR 107/Chehalis River Bridge (S. Montesano Bridge) Approach and Rail Rep16,023,0000000021,848,000
10924310918ASR 109/Moclips River Bridge - Replace Bridge 000005,313,0006,071,000
12516L2000170SR 125/9th Street Plaza - Intersection Improvements 3,502,000000003,900,000
14114414119QSR 141/Flashing School Zone Signs 00000030,000
15507L2000203SR 155/Omak Bridge Rehabilitation 11,000,0000000011,000,000
16026916008RSouthworth Tml Preservation 2,309,00018,141,0004,110,0001,216,000019,877,00047,167,000
16026916008SSR 160/Southworth Ferry Terminal - Improvements 000000640,000
16034900005MFauntleroy Tml Preservation 4,936,0003,936,00014,791,00069,339,0001,080,00013,418,000109,399,000
16034900005NFauntleroy Tml Improvement 000000617,000
16034900006SVashon Tml Preservation 470,0002,038,0003,933,0002,702,0004,670,0005,297,00034,773,000
16034900006TVashon Tml Improvement 0000005,200,000
16125L110004831st Ave SW Overpass - Improvements 0000001,102,000
16125,31316118CSR 161/36th to Vicinity 24th St E - Widen to 5 lanes 0000031,386,00031,386,000
16130,31316118ASR 161/24th St E to Jovita - Add Lanes 00000052,068,000
16202316218ASR 162/Orting Area - Construct Pedestrian Evacuation Crossing 000000854,000
16202,25,31L2000107SR 162 Study/Design 000000396,000
16231L1000276SR 162/410 Interchange Design and Right of Way Project 1,000,000000001,000,000
16327900001GPoint Defiance Tml Preservation 001,075,0002,204,0004,279,0004,803,00014,480,000
16327900001HPoint Defiance Tml Improvement 200,000000001,565,000
16334900002GTahlequah Tml Preservation 00205,0001,803,0002,826,00013,636,00019,155,000
16334900002HTahlequah Tml Improvement 702,000000001,208,000
16711,33,47L2000187SR 167/HOT Lanes Tolling Equipment R&R 000000841,000
16725,27,30,31,33M00600RSR 167/SR 509 Puget Sound Gateway 265,100,000395,400,000473,300,000493,000,000171,100,00020,000,0001,953,900,000
16725,30,31316706CSR 167/SR 410 to SR 18 - Congestion Management 17,712,00030,921,00010,000,00060,000,00010,000,0000129,200,000
16725,30,31316706QSR 167/SR 410 to SR 18 - ITS 92,000900,00000001,000,000
16730,33,47816701CSR 167/8th St E Vic to S 277th St Vic - Southbound Managed Lane 60,0000000083,931,000
18216518203QI-182/Argent Rd Vicinity EB - Install VMS 520,00000000520,000
1950920150017Pullman Transit - Two, 40-foot Electric Hybrid Buses to Increase Capacit0000001,056,000
19509619503KUS 195/Spring Flat Creek - Bridge Replacement 000003,302,0003,302,000
19509L2000058US 195/Colfax to Spangle - Add Passing Lane 00000011,650,000
20549420511AI-205/Mill Plain Interchange to NE 18th St - Build Interchange - Stage 200000039,765,000
20549420520QI-205/NB Mill Plain On-Ramp - Ramp Meter 466,00000000466,000
20549420522QI-205/SB Mill Plain and SB 18th St On-Ramps - Ramp Meters 240,00000000240,000
24008524001QSR 240/Jadwin Ave to I-182 - Install Traffic Cameras 000000260,000
24008524002GSR 240/Richland Y to Columbia Center I/C - Add Lanes 00000041,021,000
24008524003SSR 240/Kingsgate Way - Signalize Intersection 000000452,000
24008L2000202SR 240/Richland Corridor Improvements 5,000,000000005,000,000
24008L2000230SR 240/Hagen Road - Traffic Lights 000000305,000
24115L2000174SR 241/Mabton Bridge 6,000,0000000011,970,000
24115L2000280SR 241/Sunnyside Vicinity Improvements 0000001,500,000
2851220150015Link Transit - Wenatchee Riverfront Shuttle 0000002,508,000
28512228500QSR 285/Wenatchee Area - ITS Conduit 450,00000000450,000
28512228501XSR 285/W End of George Sellar Bridge - Intersection Improvements 00000017,437,000
28512L2000061SR 28/SR 285, North Wenatchee Area Improvements 1,100,0006,000,00013,400,0002,000,0000023,000,000
28512L2000286Wenatchee - Confluence Parkway 000000400,000
29003629001DSR 290/Spokane River E Trent Br - Replace Bridge 16,736,000317,000000019,871,000
29004L2000256Barker Rd/Trent Ave Grade Separation 0000001,500,000
30323,26,35L2000339SR 303 Warren Ave Bridge Pedestrian Improvements 1,500,000000001,500,000
30426930410TBremerton Tml Preservation 210,0003,218,00028,176,0007,121,00008,053,00048,796,000
30426930410UBremerton Tml Improvement 0000001,472,000
30523900040NEagle Harbor Maint Facility Preservation 0442,00015,662,0004,413,0001,837,00026,954,00082,669,000
30523900040OEagle Harbor Maint Facility Improvement 1,368,0002,172,000799,0003,236,0007,909,000017,889,000
30523930513GBainbridge Island Tml Preservation 8,656,00015,465,0006,802,0001,331,0005,586,00016,334,00065,382,000
30523930513HBainbridge Island Tml Improvement 0000002,080,000
30523N30500RSR 305 Construction - Safety & Mobility Improvements 18,900,0007,200,000000036,800,000
39503,04,06,07600010AUS 395/North Spokane Corridor 17,00000000229,709,000
39503,04,07M00800RUS 395 North Spokane Corridor 164,000,000209,000,000202,900,000173,000,00061,000,0000878,900,000
39506,07639516QUS 395/Hawthorne Rd - Intersection Improvements 000000953,000
39508L2000253US 395/N Yelm Street - Noise Study 000000200,000
39508,16L2000127US 395/Ridgeline Intersection 17,000,0000000021,000,000
39509,16L2000128US 395/Safety Corridor Improvements 10,000,0000000015,000,000
40501,21L1000163I-405 NB Hard Shoulder Running -- SR 527 to I-5 36,0000000011,586,000
40501,21,32L2000234I-405/SR 522 to I-5 Capacity Improvements 83,000,000396,000,000153,000,000000640,001,000
40501,41,45,488BI1002I-405/Kirkland Vicinity Stage 2 - Widening (Nickel/TPA) 1,200,00000000342,741,000
40501,451405RRTI-405/Bellevue to Lynnwood R&R - Preservation 03,700,00015,592,00011,764,0006,095,00070,139,000107,290,000
40501,45L1000110I-405/NE 132nd Interchange - Totem Lake 54,000,00021,000,000000083,000,000
40511840502BI-405/SR 181 to SR 167 - Widening 42,00000000140,044,000
40511,37140504CI-405/SR 167 Interchange - Direct Connector 0000013,816,00041,618,000
40511,37,418BI1006I-405/Renton to Bellevue Widening and Express Toll Lanes 00000021,656,000
40511,37,41,48M00900RI-405/Renton to Bellevue - Corridor Widening 384,425,000220,000,000160,000,00010,000,000225,000,00001,225,337,000
40511,37,478BI1001I-405/South Renton Vicinity Stage 2 - Widening (Nickel/TPA) 000000164,275,000
40541840541FI-405/I-90 to SE 8th St - Widening 5,000,00000000179,816,000
40541L1000250I-405/ 44th Gateway Signage and Green-Scaping Improvements 210,00000000210,000
40541,48840551AI-405/NE 8th St to SR 520 Braided Ramps - Interchange Improvements 000000203,268,000
40542,45,4820150008King County Metro - Route 245 Corridor Speed and Reliability Improvement656,000000002,192,000
41031L1000165Traffic Avenue / SR 410 Interchange 500,00000000800,000
43219L2000091SR 432 Longview Grade Crossing 14,400,00060,600,0004,500,00000085,000,000
50049450000ASR 500/St Johns Blvd - Build Interchange 00000045,098,000
50149L2000117SR 501/I-5 to Port of Vancouver 4,700,000000007,000,000
50217,18450208WSR 502/I-5 to Battle Ground - Add Lanes 00000082,799,000
50217,18L2000065SR 502 Main Street Project/Widening 4,500,000000007,700,000
50317,18450317QSR 503 ATIS Infill-I/S Bypass; 4th Plain to Main St. and Signal Study 000000815,000
50317,18450317TSR 503, Fourth Plain to Main Street ITS Device Infill 000000380,000
50933850901FSR 509/I-5 to Sea-Tac Freight & Congestion Relief 00000031,347,000
51002351025ASR 510/Yelm Loop - New Alignment 00000029,349,000
51002T32700RSR 510/Yelm Loop Phase 2 31,413,00023,587,000000058,500,000
51225,29351207QSR 512/SR 7 to I-5 - Congestion Management 0000001,556,000
51225,29351207RSR 512/I-5 to SR 7 EB - Congestion Management 401,00000000495,000
51633,47L2000268Willis St (SR 516) and 4th Ave Roundabout 2,500,000000003,000,000
51647L2000017SR 516/Wax Rd to 185th Ave SE - Improvements 0000002,800,000
51647L2220059SR 516/Jenkins Creek to 185th Avenue - Widening 11,522,0000000013,522,000
51833T32800RSR 518 Des Moines Interchange Improvement 00000013,515,000
51943900010LSeattle Tml Preservation 114,956,000130,817,0000000455,468,000
51943900010MSeattle Tml Improvement 3,500,0000000015,194,000
51943L1000168Seattle Tml - Slip 2 and LCCM 0447,0005,608,00012,151,00016,276,00011,728,00048,646,000
52043852006WSR 520 Westside Design Development 00000024,000,000
52043L2000271520 Montlake Noise Mitigation 250,00000000500,000
52043M00400RSR 520 Seattle Corridor Improvements - West End 396,224,000367,702,000297,208,000359,769,000001,643,315,000
52043,48152099VSR 520/Evergreen Point Floating Bridge R&R - Preservation 544,000294,0001,786,0003,899,00016,837,000379,020,000404,338,000
52043,488BI1003SR 520/ Bridge Replacement and HOV (Nickel/TPA) 28,882,000000002,679,890,000
52043,488BI1009SR 520/Repayment of Sales Tax for Bridge Replacement 015,940,00031,880,00031,880,00031,880,00047,820,000159,400,000
52043,48L1000033Lake Washington Congestion Management 00000086,931,000
520481BI1001SR 520/Bellevue Corridor Improvements - East End 0000002,576,000
52048L1000098SR 520/124th St Interchange (Design and Right of Way) 19,800,00021,100,000000040,900,000
52048L1100101SR 520/148th Ave NE Overlake Access Ramp 60,120,0004,900,000000068,000,000
52201152233QSR 522/Fales-Echo Lake Rd Interchange - Ramp Meters 500,00000000500,000
52201NPARADISR 522/Paradise Lk Rd Interchange & Widening on SR 522 (Design/Engineeri12,800,00010,000,000000023,550,000
52201,39152234ESR 522/Snohomish River Bridge to US 2 - Add Lanes 294,00000000145,630,000
52201,46152201CSR 522/I-5 to I-405 - Multimodal Improvements 31,0000000022,566,000
52246L1000133Lyon Creek Culvert 000000875,000
52246L2000263SR 522 Crossing in Kenmore 250,00000000500,000
52246T10600RComplete SR 522 Improvements-Kenmore 08,000,00000008,000,000
52332L1000059SR 523 Corridor Study 000000316,000
52332L1000148SR 523 145th Street 12,500,00012,500,000000025,000,000
52432N52400RSR 524: 48th Ave W - 37th Ave W Widening 10,000,0000000014,864,000
52510952516RClinton Tml Preservation 400,00004,521,0001,284,0001,335,0008,346,00017,162,000
52510952516SClinton Tml Improvement 25,00001,710,0007,252,00021,122,0005,810,00036,287,000
52510L2000166Clinton Tml Road Improvements 25,0005,00000003,004,000
52510L2000252SR 525 Improvements - Freeland Vicinity 0000001,500,000
52521952515PMukilteo Tml Improvement 61,111,00000000187,300,000
52638N52600RSR 526 Corridor Improvements 6,000,00038,197,000000047,197,000
52701,44152711QSR 527/Bothell to Dumas Rd - Pedestrian & Bicycle Improvements 000000129,000
52744L1000173SR 527 Pedestrian Safety Project - The Parker & Quincy Memorial Pathway 570,00000000800,000
52938152908ESR 529/Ebey Slough Bridge - Replace Bridge 00000033,045,000
53039153054ASR 530/Chief Brown Road Vicinity - Flashing Radar Speed Signs 00000040,000
53110,39L1000114SR 531/43rd Ave NE to 67th Ave NE - Corridor Improvements 4,900,00010,900,00023,500,00000039,300,000
53139153160ASR 531/43rd Ave NE to 67th Ave. NE - Widening 0000001,879,000
53210053255CSR 532/Camano Island to I-5 Corridor Improvements (TPA) 00000086,191,000
53210153203DSR 532/General Mark W. Clark Memorial Bridge - Replace Bridge 00000018,826,000
53942153915ASR 539/Lynden-Aldergrove Port of Entry Improvements 0000007,501,000
53942L2000118SR 539/Guide Meridian 0016,000,00024,000,0000040,000,000
54242154205GSR 542/Everson Goshen Rd Vic to SR 9 Vic - Intersections Improvements 0000005,826,000
54742L1000200SR 547 Pedestrian and Bicycle Safety Trail 000000305,000
70402,28370401ASR 704/Cross Base Highway - New Alignment 0000018,256,00040,900,000
90005L1000182SR 900-12th Ave NW Enhanced Turning Capacity 1,000,000000001,500,000
90011,37L1000193Bronson Way Bridge - Seismic Retrofit and Painting 2,700,000000003,000,000
90037L2000238SR 900 Pedestrian Safety 318,00000000332,000
959 L1000016Primavera Project Management System 348,000361,000375,0000002,473,000
959 L2000007Terminal Project Support 6,981,0007,136,0008,521,0009,295,0009,697,00020,594,00089,190,000
998 099902DOther Facilities Project Reserve - Major Drainage/Electrical Systems 006,000,00010,000,00024,849,00056,004,00096,853,000
998 099902FEnvironmental Retrofit Project Reserve - Fish Barrier Passage 0002,088,00041,434,000122,439,000165,961,000
998 099902ISafety Project Reserve - Collision Reduction 00028,023,00026,252,00076,852,000131,127,000
998 099902JSafety Project Reserve - Collision Prevention 00065,385,00061,253,000179,318,000305,956,000
998 099902KEnvironmental Retrofit Project Reserve - Stormwater Runoff 02,249,0003,429,0003,705,0000010,383,000
998 099902NProject Reserve - Noise Reduction 140,000114,0003,000,0000003,254,000
998 099902QEnvironmental Retrofit Project Reserve - Chronic Environment Deficiency 0175,0002,670,0002,885,000008,730,000
998 099905QFuture Local Funds for Improvement Program 10,000,00010,000,00010,000,00010,000,00010,000,00030,000,00090,000,000
998 099906QSet Aside for Local funds - Preservation 4,000,0004,000,0004,000,0004,000,0004,000,00012,000,00036,000,000
998 099907QSet Aside for Federal Discretionary Funds - Preservation 10,000,00010,000,00010,000,00010,000,00010,000,00030,000,00090,000,000
998 099960KEmergency Slide & Flood Reserve 20,000,00020,000,00020,000,00020,000,00020,000,00060,000,000180,000,000
998 099960PStatewide Safety Rest Area Minor Projects and Emergent Needs 350,000350,000350,000350,000350,0001,050,0004,659,000
998 0BI4001Fish Passage Barrier 100,000,00083,385,000116,905,00056,954,00048,572,00057,565,000685,770,000
998 0LP500ZState Infrastructure Bank 1,774,0002,393,0002,393,00000010,323,000
99810,21,23,26,31,34,40998926AWSF/Systemwide Terminals - Out Biennia Security LCCM Preservation Needs 05,011,0001,461,000584,0002,346,0001,538,00011,181,000
99810,21,23,26,34,40,43998925ASecurity System Upgrades Placeholder for W1 0000003,549,000
999 095901WSet Aside for Preservation Program Support Activities 61,615,00062,906,00064,206,00065,495,00066,774,000208,713,000829,222,000
999 099915ESafety Rest Areas with Sanitary Disposal - Preservation Program 423,0001,410,000793,000751,000750,000750,0007,315,000
999 998901JWSF/Administrative Support - Allocated to W1 7,462,0004,984,0002,681,0002,242,0002,165,0007,785,00041,523,000
999 D300701Statewide Administrative Support 979,0001,028,0001,076,0001,125,0001,173,0003,758,00014,283,000
999 D309701Preservation and Improvement Minor Works Projects 4,521,0004,673,0004,825,0004,977,0005,129,00015,386,00048,082,000
99932G2000001